TEXAS · WELLS · ERATH COUNTY · API 42-143-30972 · DISTRICT 6E
Herrera #1
Erath County · Mingus (Strawn 1700) field · Vertical
Herrera #1 (API 42-143-30972) is a plugged well in Erath County, plugged September 2, 2015, last operated by Stephens & Johnson Operating CO..
The RRC has issued 2 drilling permits between 1996 and 1998, permitted to 4,000 ft.
Completion filings report 6 formation tops, including Gordon Sd., Strawn, Bs Congl. No. 5u, Bs Congl. No. 5.
Operator of record
Stephens & Johnson Operating Co.
- Based in
- Wichita Falls, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jul 2, 2026
- Permits on file
- 360
- Phone
- (940) 723-2166
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stephens & Johnson Operating Co. |
| Production reports | Stephens & Johnson Operating Co.through Feb 2005 |
| Latest permit | Stephens & Johnson Operating Co.May 13, 1998 |
- 4,000
- total depth, ft
- 2
- permits on file
- May 13, 1998
- last permit issued
- May 14, 1998
- completed
- 0
- cumulative oil, bbl
- 107K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1997 THROUGH Sep 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 14, 1998
- Shut in
- —
- Plugged
- Sep 2, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Herrera G-8-165396 | Diaz (Strawn) | Stephens & Johnson Operating Co. | 1 | 0 | 3.8K | Oct 1997 – Sep 2015 |
| Herrera G-8-168714 | Mingus (Strawn 1700) | Stephens & Johnson Operating Co. | 1 | 0 | 104K | May 1998 – Sep 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stephens & Johnson Operating Co.Oct 1997 → Feb 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 476249-99 | Recompletion | Stephens & Johnson Operating Co. | May 13, 1998 | May 13, 1998 | May 13, 1998 | 3,620 |
| 453727-99 | Drill | Stephens & Johnson Operating Co. | Oct 11, 1996 | Oct 11, 1996 | Aug 3, 1997 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 14, 1998 | Herrera G-8-168714 | Mingus (Strawn 1700) | Stephens & Johnson Operating Co. | Plugged | — |
| Oct 24, 1997 | Herrera G-8-165396 | Diaz (Strawn) | Stephens & Johnson Operating Co. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,085 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,644 | 1,685 | Perforated |
| 1,912 | 1,920 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 259 | 12.25 | 180 S |
| 4.5 | 3,547 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 27, 1998 | Jun 8, 1998 | Yes |
| 00 | Jul 9, 1998 | — | — |
| 00 | Jan 20, 1998 | Jun 15, 1998 | Yes |
| 00 | Dec 8, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-143-30972 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-143-30972 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14330972, documented in the API reference.