WELL · 42-143-31151 · DISTRICT 9
Gne #1 S
Erath County · Newark East (Barnett Shale) field · Vertical
Gne #1 S (API 42-143-31151) is a plugged well in Erath County, plugged August 29, 2011, last operated by Wildhorse Energy CO..
The RRC has issued one drilling permit, issued July 3, 2006, permitted to 6,400 ft.
It was permitted by Great Northern Energy Inc. and has since transferred to Wildhorse Energy CO. on the wellbore schedule.
Completion filings report 2 formation tops, including Marble Falls, Ellenburger.
Operator of record
Permitted by Great Northern Energy Inc.; the EWA schedule now lists a different operator.
- Based in
- Stephenville, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Mar 10, 2010
- Permits on file
- 1
- Phone
- (254) 968-3686
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wildhorse Energy Co. |
| Production reports | none |
| Latest permit | Great Northern Energy Inc.Jul 3, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,400
- total depth, ft
- 1
- permits on file
- Jul 3, 2006
- last permit issued
- Aug 5, 2006
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 5, 2006
- Shut in
- —
- Plugged
- Aug 29, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gne O-13-31620 | Newark, East (Barnett Shale) | Wildhorse Energy Co. | 1 | 0 | 0 | Aug 2009 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 621883-99 | Drill | Great Northern Energy Inc. | Jun 30, 2006 | Jul 3, 2006 | Jul 12, 2006 | 6,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-31620 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,291 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble Falls | 3,500 | -2,209 |
| Ellenburger | 3,960 | -2,669 |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 446 | 12.25 | 300 S |
| 4.5 | 4,122 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 12, 2010 | Feb 8, 2010 | Yes |
| 00 | Aug 10, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-143-31151 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-143-31151 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Sep 2010
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000098869 | W-14 Disposal | Plugged Oct 3, 2011 | 10,000 | 2,000 | 4,210–4,742 |
MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14331151, documented in the API reference.