WELL · 42-143-31319 · DISTRICT 9
Strickland Unit #1
Erath County · Newark East (Barnett Shale) field · Vertical
Strickland Unit #1 (API 42-143-31319) is a plugged well in Erath County, plugged September 21, 2010, last operated by Cumming Company Inc. The.
The RRC has issued one drilling permit, issued May 23, 2008, permitted to 3,900 ft.
It was permitted by Hess, Jerry Operating CO. and has since transferred to Cumming Company Inc. The on the wellbore schedule.
Completion filings report 2 formation tops, including Barnett, Ellenburger.
Operator of record
Permitted by Hess, Jerry Operating Co.; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 18, 2026
- Permits on file
- 410
- Phone
- (817) 737-2393
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cumming Company Inc. The |
| Production reports | Cumming Company, Inc. Thethrough Jun 2010 |
| Latest permit | Hess, Jerry Operating Co.May 23, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,900
- total depth, ft
- 1
- permits on file
- May 23, 2008
- last permit issued
- Jul 22, 2008
- completed
- 0
- cumulative oil, bbl
- 42.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2008 THROUGH Sep 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 22, 2008
- Shut in
- —
- Plugged
- Sep 21, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Strickland Unit G-13-246509 | Newark, East (Barnett Shale) | Cumming Company, Inc. The | 1 | 0 | 42.2K | Jul 2008 – Sep 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hess, Jerry Operating Co.Jul 2008 → Feb 2009
- 2Cumming Company, Inc. TheMay 2010 → Jun 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 661440-99 | Drill | Hess, Jerry Operating Co. | May 7, 2008 | May 23, 2008 | May 31, 2008 | 3,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-246509 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,206 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BarnettBARNETT SHALE | 3,634 | -2,428 |
| EllenburgerELLENBERGER | 3,770 | -2,564 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,635 | 3,748 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 321 | 12.25 | 200 S |
| 4.5 | 3,781 | 7.875 | 195 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 29, 2009 | Oct 6, 2008 | Yes |
| 00 | Apr 23, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-143-31319 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-143-31319 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14331319, documented in the API reference.