WELL · 42-149-32177 · DISTRICT 3

Ruth Unit #1

Plugged

Fayette County · Giddings (Austin Chalk-3) field  · Horizontal · Sidetrack

Ruth Unit #1 (API 42-149-32177) is a plugged horizontal well in Fayette County, plugged April 27, 2007, last operated by Wcs Oil & Gas Corporation.

The RRC has issued 3 drilling permits (amended twice) between 1986 and 1993, permitted to 11,500 ft.

It was permitted by United Oil & Minerals, Inc. and has since transferred to Wcs Oil & Gas Corporation on the wellbore schedule.

Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford.

Its lease has reported 83.7K barrels of oil and 892K mcf of gas since January 1993, last reporting in June 2007.

Operator of record

WCS Oil & Gas Corporation

Permitted by United Oil & Minerals, Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Sep 28, 2021
Permits on file
44
Phone
(214) 357-9116

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWCS Oil & Gas Corporation
Production reportsWCS Oil & Gas Corporationthrough Nov 2006
Latest permitUnited Oil & Minerals, Inc.Jun 9, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,500
total depth, ft
5
permits on file
Jun 9, 1993
last permit issued
Jul 3, 1993
completed
83.7K
cumulative oil, bbl
892K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2007

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 3, 1993
Shut in
—
Plugged
Apr 27, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ruth Unit O-3-19341Giddings (Austin Chalk-3)WCS Oil & Gas Corporation183.7K892KJan 1993 – Jun 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1United Oil & Minerals, Inc.Jan 1993 → Dec 1998
  2. 2WCS Oil and Gas CorporationJan 1999 → Apr 2005
  3. 3WCS Oil & Gas CorporationMay 2005 → Nov 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
412615-98Recompletion · sidetrackUnited Oil & Minerals, Inc.Sep 23, 1993Jun 9, 1993—11,500
412615-99Recompletion · sidetrackUnited Oil & Minerals, Inc.Jun 9, 1993Jun 9, 1993Jun 22, 199310,000
389139-98DrillUnited Oil & Minerals, Inc.Jul 14, 1992Jun 20, 1991—10,900
389139-99DrillUnited Oil & Minerals, Inc.Jun 20, 1991Jun 20, 1991May 23, 199110,000
303630-99DrillUnited Oil & Minerals, Inc.Jun 25, 1986Jun 27, 1986—11,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-19341————

Formation tops

As filed on W-2/G-1. Subsea from 332 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap9,850-9,518
Austin Chalk10,197-9,865
Eagle FordEAGLEFORD10,954-10,622

Perforations

Perforated and open-hole intervals.

FromToType
10,23010,918Perforated
10,23010,954Perforated
10,84711,320Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,62412.25775 S
9.6252,624——
710,2308.75135 S
710,230——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 11, 1993Jul 13, 1993Yes
00Sep 15, 1992Aug 16, 1991Yes
00Sep 22, 1986Aug 20, 1986Yes
00Sep 8, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/14932177, documented in the API reference.