WELL · 42-149-32551 · DISTRICT 3

Vasek-Morgan Unit #1

Y

Fayette County · Giddings (Austin Chalk-3) field · Producing  · Horizontal

Vasek-Morgan Unit #1 (API 42-149-32551) is a horizontal well in Fayette County operated by Magnolia Oil & Gas Operating LLC, completed February 13, 1992 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 4, 1991, permitted to 13,375 ft.

It was permitted by Union Pacific Resources Company and has since transferred to Magnolia Oil & Gas Operating LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Midway, Navarro, Taylor, Pecan Gap.

Its lease has reported 155K barrels of oil and 1.22M mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Magnolia Oil & Gas Operating LLC

Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
May 6, 2026
Permits on file
615
Phone
(713) 842-9050

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMagnolia Oil & Gas Operating LLC
Production reportsMagnolia Oil & Gas Operating LLCthrough Apr 2026
Latest permitUnion Pacific Resources CompanyDec 4, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,375
total depth, ft
1
permits on file
Dec 4, 1991
last permit issued
Feb 13, 1992
completed
155K
cumulative oil, bbl
1.22M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 13, 1992
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vasek-Morgan Unit O-3-21400Giddings (Austin Chalk-3)Magnolia Oil & Gas Operating LLC1155K1.22MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 1,388 · prior 12 4,955(-72%)

05001K202420252026

Oil, barrels lease total

Last 12 months 501 · prior 12 747(-33%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyJan 1993 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Jul 2007
  4. 4Enervest Operating, L.L.C.Aug 2007 → Jul 2018
  5. 5Magnolia Oil & Gas Operating LLCAug 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
394707-99DrillUnion Pacific Resources CompanyDec 4, 1991Dec 4, 1991Jan 1, 199213,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 13, 1992Vasek-Morgan Unit O-3-21400Giddings (Austin Chalk-3)Magnolia Oil & Gas Operating LLCProducing13,375

Formation tops

As filed on W-2/G-1. Subsea from 279 ft elevation.Download CSV →

FormationMD ftSubsea
Midway6,191-5,912
Navarro7,306-7,027
Taylor7,863-7,584
Pecan Gap8,663-8,384
Austin Chalk9,027-8,748

Perforations

Perforated and open-hole intervals.

FromToType
9,22013,375Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,23714.751,560 S
7.6259,2209.875340 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 1, 1992Feb 19, 1992Yes
00Mar 23, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/14932551, documented in the API reference.