WELL · 42-149-32607 · DISTRICT 3
James Oil Unit #1
Fayette County · Giddings (Austin Chalk-3) field · Horizontal
James Oil Unit #1 (API 42-149-32607) is a plugged horizontal well in Fayette County, plugged August 17, 2021, last operated by Ineos USA Oil & Gas LLC.
The RRC has issued one drilling permit, issued March 30, 1992, permitted to 14,000 ft.
It was permitted by Tana Oil And Gas Corporation and has since transferred to Ineos USA Oil & Gas LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Taylor, Pecan Gap, Austin Chalk.
Its lease has reported 94.5K barrels of oil and 502K mcf of gas since January 1993, last reporting in November 2025.
Operator of record
Permitted by Tana Oil and Gas Corporation; the EWA schedule now lists a different operator.
- Based in
- Denver, CO
- P-5 status
- Active – Extension (X)
- P-5 last filed
- May 26, 2026
- Permits on file
- 98
- Phone
- (720) 764-3473
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ineos USA Oil & Gas LLC |
| Production reports | Ineos USA Oil & Gas LLCthrough Jan 2020 |
| Latest permit | Tana Oil and Gas CorporationMar 30, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,000
- total depth, ft
- 1
- permits on file
- Mar 30, 1992
- last permit issued
- May 12, 1992
- completed
- 94.5K
- cumulative oil, bbl
- 502K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 12, 1992
- Shut in
- —
- Plugged
- Aug 17, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| James Oil Unit O-3-21530 | Giddings (Austin Chalk-3) | Ineos USA Oil & Gas LLC | 1 | 94.5K | 502K | Jan 1993 – Nov 2025 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tana Oil and Gas CorporationJan 1993 → Oct 1995
- 2Rosewood Resources, Inc.Nov 1995 → Aug 1999
- 3Emerald Operating Company, Inc.Sep 1999 → Aug 2008
- 4Enervest Operating, L.L.C.Sep 2008 → Aug 2017
- 5Crawford Hughes Operating Co.Sep 2017 → Jul 2019
- 6Ineos USA Oil & Gas LLCAug 2019 → Jan 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 397853-99 | Drill | Tana Oil and Gas Corporation | Mar 27, 1992 | Mar 30, 1992 | Apr 16, 1992 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-21530 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 340 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Taylor | 7,100 | -6,760 |
| Pecan Gap | 8,280 | -7,940 |
| Austin Chalk | 8,600 | -8,260 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,180 | 9,428 | Perforated |
| 9,204 | 12,815 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,949 | 12.25 | 1,010 S |
| 7 | 8,905 | 8.75 | 330 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 17, 1992 | Jun 15, 1992 | Yes |
| 00 | Jul 9, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-149-32607 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-149-32607 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14932607, documented in the API reference.