TEXAS · WELLS · FISHER COUNTY · API 42-151-30785 · DISTRICT 7B

Nunn #1WD

Plugged

Fisher County  · Vertical

Nunn #1WD (API 42-151-30785) is a plugged well in Fisher County, plugged September 4, 1977, last operated by L.C.S. Production Company.

The RRC has issued 2 drilling permits between 1977 and 2012, permitted to 7,500 ft.

Operator of record

L.C.S. Production Company

Based in
Abilene, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 14, 2026
Permits on file
1,707
Phone
(325) 692-3903

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitL.C.S. Production CompanyApr 24, 2012
7,500
total depth, ft
2
permits on file
Apr 24, 2012
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Sep 4, 1977

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
737647-99ReenterL.C.S. Production CompanyApr 5, 2012Apr 24, 2012—7,500
5400-99DrillFisher-Webb, Inc.Aug 15, 1977Aug 15, 1977Aug 15, 19776,658

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2014
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000104769W-14 DisposalCanceled Apr 21, 20155,0003,3256,650–7,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120132014

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15130785, documented in the API reference.