WELL · 42-151-32070 · DISTRICT 7

Fields #1

Plugged

Fisher County · Raven Creek North (Strawn) field  · Vertical

Fields #1 (API 42-151-32070) is a plugged well in Fisher County, plugged June 1, 2009, last operated by American Cascade Energy Inc..

The RRC has issued 2 drilling permits between 1985 and 1986, permitted to 5,050 ft.

It was permitted by Sojourner Drlg. Corp. and has since transferred to American Cascade Energy Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including B/Coleman Jc., B/Breckenridge Lm., T/Strawn Reef.

Operator of record

American Cascade Energy Inc.

Permitted by Sojourner Drlg. Corp.; the EWA schedule now lists a different operator.

Based in
Barker, TX
P-5 status
Delinquent (D)
P-5 last filed
Jul 29, 1997
Permits on file
74
Phone
(281) 579-1004

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSojourner Drlg. Corp.Mar 3, 1986
5,050
total depth, ft
2
permits on file
Mar 3, 1986
last permit issued
Mar 4, 1986
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 4, 1986
Shut in
—
Plugged
Jun 1, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fields O-8-23522Raven Creek,north (Strawn)American Cascade Energy, Inc.100Jan 1993 – Feb 2016

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
298986-99DrillSojourner Drlg. Corp.Feb 20, 1986Mar 3, 1986—5,050
295479-99DrillSojourner Drlg. Corp.Jan 16, 1986Jan 16, 1985Jan 17, 19864,999

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 4, 1986Fields O-8-23522Raven Creek North (Strawn)American Cascade Energy Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,811 ft elevation.Download CSV →

FormationMD ftSubsea
B/Coleman Jc.2,300-489
B/Breckenridge Lm.3,220-1,409
T/Strawn Reef5,020-3,209

Perforations

Perforated and open-hole intervals.

FromToType
5,0205,030Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62513612.25110 S
4.55,0207.875525 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 19, 1986Mar 7, 1986Yes
00Mar 13, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15132070, documented in the API reference.