WELL · 42-151-32097 · DISTRICT 7

Smith #1

Plugged

Fisher County · H.B.E. (Canyon) field  · Vertical

Smith #1 (API 42-151-32097) is a plugged well in Fisher County, plugged April 5, 1988, last operated by Vaquero Operating Inc..

The RRC has issued one drilling permit, issued July 25, 1986, permitted to 7,000 ft.

It was permitted by Encino Exploration, Inc. and has since transferred to Vaquero Operating Inc. on the wellbore schedule.

Completion filings report one formation top, including Canyon.

Operator of record

Vaquero Operating Inc.

Permitted by Encino Exploration, Inc.; the EWA schedule now lists a different operator.

George West, TX · P-5 Y, filed Jul 3, 1997 · 28 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVaquero Operating Inc.
Production reportsnone
Latest permitEncino Exploration, Inc.Jul 25, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,000
total depth, ft
1
permits on file
Jul 25, 1986
last permit issued
Feb 12, 1987
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 12, 1987
Shut in
—
Plugged
Apr 5, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
304599-99DrillEncino Exploration, Inc.Jul 25, 1986Jul 25, 1986—7,000

Formation tops

As filed on W-2/G-1. Subsea from 2,070 ft elevation.Download CSV →

FormationMD ftSubsea
CanyonCANYON SAND5,025-2,955

Perforations

Perforated and open-hole intervals.

FromToType
5,0255,035Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6254507.875320 S
4.56,6007.875960 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 15, 1987Mar 5, 1987Yes
00Jul 9, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15132097, documented in the API reference.