WELL · 42-151-32627 · DISTRICT 7

Albert Maberry #2

Plugged

Fisher County  · Vertical

Albert Maberry #2 (API 42-151-32627) is a plugged well in Fisher County, plugged May 4, 2007, last operated by Terrell Oil & Gas Production CO..

The RRC has issued 2 drilling permits between 2006 and 2011, permitted to 4,999 ft.

Completion filings report 3 formation tops, including Noodle Creek Limestone, Saddle Creek, Canyon.

Its lease has reported 20.1K barrels of oil and 8.77K mcf of gas since June 2011, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Terrell Oil & Gas Production Co.

Hamlin, TX · P-5 Y, filed Nov 4, 2025 · 72 permits on file · (325) 669-1776

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsTerrell Oil & Gas Production Co.through Apr 2026
Latest permitTerrell Oil & Gas Production Co.Mar 8, 2011
4,999
total depth, ft
2
permits on file
Mar 8, 2011
last permit issued
—
completed
20.1K
cumulative oil, bbl
8.77K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 4, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Albert Maberry O-8-30790Noodle, NW. (Canyon Sd. 4100)Terrell Oil & Gas Production Co.320.1K8.77KJun 2011 – Jul 2026

Oil, barrels lease total

Last 12 months 634 · prior 12 716(-11%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Terrell Oil & Gas Production Co.Jun 2011 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
711214-99ReenterTerrell Oil & Gas Production Co.Mar 1, 2011Mar 8, 2011May 6, 20114,700
628882-99DrillTerrell Oil & Gas Production Co.Nov 10, 2006Nov 27, 2006Apr 23, 20074,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-30790————

Formation tops

As filed on W-2/G-1. Subsea from 1,807 ft elevation.Download CSV →

FormationMD ftSubsea
Noodle Creek Limestone2,710-903
Saddle CreekSADDLE CREEK LIMESTONE2,930-1,123
CanyonCANYON SAND4,135-2,328

Perforations

Perforated and open-hole intervals.

FromToType
4,1354,175Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62511812.25100 S
4.54,4097.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 30, 2011Jul 12, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.