WELL · 42-151-32921 · DISTRICT 7
Kidd BC #1
Fisher County · Claytonville N. (Palo Pinto) field · Vertical
Kidd BC #1 (API 42-151-32921) is a plugged well in Fisher County, plugged September 19, 2022, last operated by Gunn Oil Company.
The RRC has issued 2 drilling permits between 2012 and 2014, permitted to 7,500 ft.
Completion filings report 3 formation tops, including Coleman Junction, Noodlecreek, King Sand.
Its 2 leases have reported 48.4K barrels of oil and 64.6K mcf of gas since March 2013, last reporting in August 2023. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Wichita Falls, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 22, 2026
- Permits on file
- 743
- Phone
- (940) 723-5585
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Gunn Oil Company |
| Production reports | Gunn Oil Companythrough Sep 2021 |
| Latest permit | Gunn Oil CompanyDec 30, 2014 |
- 7,500
- total depth, ft
- 2
- permits on file
- Dec 30, 2014
- last permit issued
- Nov 7, 2014
- completed
- 48.4K
- cumulative oil, bbl
- 64.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2013 THROUGH Aug 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 7, 2014
- Shut in
- —
- Plugged
- Sep 19, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kidd BC O-8-31403 | Claytonville, N. (Palo Pinto) | Gunn Oil Company | 3 | 46.4K | 22.4K | Oct 2013 – Aug 2023 |
| Kidd BC O-8-31169 | Claytonville (Canyon Sand) | Gunn Oil Company | 1 | 1.94K | 42.2K | Mar 2013 – Feb 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gunn Oil CompanyMar 2013 → Sep 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 800981-99 | Recompletion | Gunn Oil Company | Dec 1, 2014 | Dec 30, 2014 | Oct 31, 2014 | 4,513 |
| 752125-99 | Drill | Gunn Oil Company | Nov 27, 2012 | Dec 3, 2012 | Dec 31, 2012 | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-31169 | — | — | — | — |
| — | — O-8-31403 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,109 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman Junction | 3,296 | -1,187 |
| Noodlecreek | 3,788 | -1,679 |
| King Sand | 5,650 | -3,541 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,186 | 4,196 | Perforated |
| 4,212 | 4,224 | Perforated |
| 4,230 | 4,234 | Perforated |
| 4,256 | 4,270 | Perforated |
| 4,401 | 4,412 | Perforated |
| 5,664 | 5,667 | Perforated |
| 5,688 | 5,691 | Perforated |
| 5,721 | 5,724 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 211 | 12.25 | 150 S |
| 5.5 | 3,702 | 7.875 | 200 S |
| 5.5 | 5,826 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 20, 2015 | Dec 31, 2014 | Yes |
| 00 | Apr 12, 2013 | Mar 22, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-151-32921 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-151-32921 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 10.8K
- bbl, last 12 reported months
- 921K
- bbl, all reported
- Nov 2021
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000111090 | W-14 Disposal | Plugged Oct 11, 2022 | 750 | 2,090 | 4,186–4,412 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 10,795 · prior 12 73,630(-85%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15132921, documented in the API reference.