WELL · 42-151-32921 · DISTRICT 7

Kidd BC #1

Plugged

Fisher County · Claytonville N. (Palo Pinto) field  · Vertical

Kidd BC #1 (API 42-151-32921) is a plugged well in Fisher County, plugged September 19, 2022, last operated by Gunn Oil Company.

The RRC has issued 2 drilling permits between 2012 and 2014, permitted to 7,500 ft.

Completion filings report 3 formation tops, including Coleman Junction, Noodlecreek, King Sand.

Its 2 leases have reported 48.4K barrels of oil and 64.6K mcf of gas since March 2013, last reporting in August 2023. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Gunn Oil Company

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Apr 22, 2026
Permits on file
743
Phone
(940) 723-5585

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGunn Oil Company
Production reportsGunn Oil Companythrough Sep 2021
Latest permitGunn Oil CompanyDec 30, 2014
7,500
total depth, ft
2
permits on file
Dec 30, 2014
last permit issued
Nov 7, 2014
completed
48.4K
cumulative oil, bbl
64.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2013 THROUGH Aug 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 7, 2014
Shut in
—
Plugged
Sep 19, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kidd BC O-8-31403Claytonville, N. (Palo Pinto)Gunn Oil Company346.4K22.4KOct 2013 – Aug 2023
Kidd BC O-8-31169Claytonville (Canyon Sand)Gunn Oil Company11.94K42.2KMar 2013 – Feb 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Gunn Oil CompanyMar 2013 → Sep 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
800981-99RecompletionGunn Oil CompanyDec 1, 2014Dec 30, 2014Oct 31, 20144,513
752125-99DrillGunn Oil CompanyNov 27, 2012Dec 3, 2012Dec 31, 20127,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-31169————
—— O-8-31403————

Formation tops

As filed on W-2/G-1. Subsea from 2,109 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction3,296-1,187
Noodlecreek3,788-1,679
King Sand5,650-3,541

Perforations

Perforated and open-hole intervals.

FromToType
4,1864,196Perforated
4,2124,224Perforated
4,2304,234Perforated
4,2564,270Perforated
4,4014,412Perforated
5,6645,667Perforated
5,6885,691Perforated
5,7215,724Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62521112.25150 S
5.53,7027.875200 S
5.55,8267.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 20, 2015Dec 31, 2014Yes
00Apr 12, 2013Mar 22, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

10.8K
bbl, last 12 reported months
921K
bbl, all reported
Nov 2021
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000111090W-14 DisposalPlugged Oct 11, 20227502,0904,186–4,412

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 10,795 · prior 12 73,630(-85%)

010K20K30K20202021

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15132921, documented in the API reference.