WELL · 42-151-33268 · DISTRICT 7
Carter B. F. #8WI
Fisher County · Raven Creek (Canyon Sand) field · Injection · Vertical
Carter B. F. #8WI (API 42-151-33268) is a well in Fisher County operated by L.C.S. Production Company, completed July 20, 2023 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued June 23, 2022, permitted to 5,990 ft.
Completion filings report 10 formation tops, including Coleman Junction, Dothan Sand - Disposal, Noodle Creek - Disposal, Saddle Creek.
Its lease has reported 41K barrels of oil and 66.6K mcf of gas since May 2022, last reporting in July 2026. The lease carries 10 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 41.2K barrels injected in the 12 months reported through November 2025; TexNet located 0 M2+ earthquakes within 10 km over the last two years.
Operator of record
Abilene, TX · P-5 Y, filed May 4, 2026 · 1,707 permits on file · (325) 691-1085
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | L.C.S. Production Company |
| Production reports | L.C.S. Production Companythrough Apr 2026 |
| Latest permit | L.C.S. Production CompanyJun 23, 2022 |
- 5,990
- total depth, ft
- 2
- permits on file
- Jun 23, 2022
- last permit issued
- Jul 20, 2023
- completed
- 41K
- cumulative oil, bbl
- 66.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2022 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 20, 2023
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
32.607426, -100.180289
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Fisher County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carter, B. F. O-8-32592 | Raven Creek (Canyon Sand) | L.C.S. Production Company | 10 | 41K | 66.6K | May 2022 – Jul 2026 |
Oil, barrels lease total
Last 12 months 10,273 · prior 12 8,116(+27%)
Gas, mcf lease total
Last 12 months 4,047 · prior 12 10,347(-61%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1L.C.S. Production CompanyMay 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 881327-98 | Reclass | L.C.S. Production Company | Feb 14, 2023 | Jun 23, 2022 | Sep 21, 2022 | 5,990 |
| 881327-99 | Drill | L.C.S. Production Company | Jun 17, 2022 | Jun 23, 2022 | Sep 21, 2022 | 5,990 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-32592 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,847 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman JunctionCOLEMAN JUNCTION - CORROSIVE; PO | 2,297 | -450 |
| Dothan Sand - Disposal | 2,520 | -673 |
| Noodle Creek - Disposal | 2,625 | -778 |
| Saddle CreekSADDLE CREEK - DISPOSAL | 2,798 | -951 |
| Flippen - Disposal | 2,892 | -1,045 |
| CiscoCISCO (REEF, LIME, SAND) - DISPO | 3,030 | -1,183 |
| Hope - Disposal | 3,042 | -1,195 |
| Crystal Falls - Disposal | 3,093 | -1,246 |
| Breckenridge - Disposal | 3,206 | -1,359 |
| San AndresSAN ANDRES - DISPOSAL | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,250 | 4,380 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 138 | 12.25 | 100 S |
| 5.5 | 4,506 | 7.875 | 625 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 21, 2023 | Jul 20, 2023 | Yes |
| 00 | Sep 20, 2023 | Apr 24, 2023 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-151-33268 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-151-33268 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
Carter, B. F.42-151-33254
0.2 KM · L.C.S. Production Company · Section with this well →
| Coleman Junction | 2,186 | -343 |
| Noodle Creek - Disposal | 2,639 | -796 |
| Saddle Creek | 2,794 | -951 |
| Flippen - Disposal | 2,898 | -1,055 |
| Cisco | 2,987 | -1,144 |
| Hope - Disposal | 3,016 | -1,173 |
| Breckenridge - Disposal | 3,178 | -1,335 |
| San Andres | — |
10 TOPS · FIRST 8
B. F. Carter42-151-33362
0.2 KM · L.C.S. Production Company · Section with this well →
| Coleman Junction | 2,197 | -338 |
| Noodle Creek - Disposal | 2,639 | -780 |
| Saddle Creek | 2,792 | -933 |
| Flippen - Disposal | 2,904 | -1,045 |
| Cisco | 2,995 | -1,136 |
| Hope - Disposal | 3,015 | -1,156 |
| Breckenridge - Disposal | 3,174 | -1,315 |
| Dothan Sand - Disposal | — |
10 TOPS · FIRST 8
Carter, B. F.42-151-33167
0.3 KM · L.C.S. Production Company · Section with this well →
| Coleman Junction | 1,856 | 3 |
| Noodle Creek - Disposal | 2,658 | -799 |
| Flippen - Disposal | 2,890 | -1,031 |
| Swastika - Disposal | 3,286 | -1,427 |
| Canyon | 4,230 | -2,371 |
| Strawn | 4,806 | -2,947 |
| Saddle Creek | — | |
| San Andres | — |
17 TOPS · FIRST 8
B.F. Carter42-151-33356
0.3 KM · L.C.S. Production Company · Section with this well →
| Coleman Junction | 2,173 | -331 |
| Noodle Creek - Disposal | 2,623 | -781 |
| Saddle Creek | 2,786 | -944 |
| Flippen - Disposal | 2,884 | -1,042 |
| Cisco | 2,984 | -1,142 |
| Hope - Disposal | 2,999 | -1,157 |
| Breckenridge - Disposal | 3,145 | -1,303 |
| San Andres | — |
10 TOPS · FIRST 8
Carter, B. F.42-151-33150
0.3 KM · L.C.S. Production Company · Section with this well →
| Coleman Junction | 1,870 | -5 |
| Noodle Creek - Disposal | 2,670 | -805 |
| Flippen - Disposal | 2,899 | -1,034 |
| Crystal Falls - Disposal | — | |
| Cisco | — | |
| Breckenridge - Disposal | — | |
| Saddle Creek | — | |
| Hope - Disposal | — |
10 TOPS · FIRST 8
Welch42-151-33143
0.4 KM · L.C.S. Production Company · Section with this well →
| Coleman Junction | 2,209 | -343 |
| Dothan Sand - Disposal | 2,543 | -677 |
| Noodle Creek - Disposal | 2,649 | -783 |
| Saddle Creek | 2,829 | -963 |
| Flippen - Disposal | 2,921 | -1,055 |
| Cisco | 3,010 | -1,144 |
| Hope - Disposal | 3,035 | -1,169 |
| Crystal Falls - Disposal | 3,107 | -1,241 |
10 TOPS · FIRST 8
Carter, B. F.42-151-33255
0.4 KM · L.C.S. Production Company · Section with this well →
| Coleman Junction | 2,304 | -468 |
| Dothan Sand - Disposal | 2,530 | -694 |
| Noodle Creek - Disposal | 2,635 | -799 |
| Saddle Creek | 2,795 | -959 |
| Flippen - Disposal | 2,897 | -1,061 |
| Cisco | 2,972 | -1,136 |
| Hope - Disposal | 2,987 | -1,151 |
| Crystal Falls - Disposal | 3,047 | -1,211 |
10 TOPS · FIRST 8
Welch42-151-33149
0.5 KM · L.C.S. Production Company · Section with this well →
| Coleman Junction | 2,221 | -355 |
| Dothan Sand - Disposal | 2,555 | -689 |
| Noodle Creek - Disposal | 2,661 | -795 |
| Saddle Creek | 2,836 | -970 |
| Flippen - Disposal | 2,928 | -1,062 |
| Cisco | 3,014 | -1,148 |
| Hope - Disposal | 3,036 | -1,170 |
| Crystal Falls - Disposal | 3,110 | -1,244 |
10 TOPS · FIRST 8
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 41.2K
- bbl, last 12 reported months
- 116K
- bbl, all reported
- Nov 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000125363 | H-1 Injection | Active | 2,000 | 2,050 | 4,100–5,100 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 41,207 · prior 12 52,815(-22%)
TexNet catalog via USGS
Seismicity near this well
- 0
- M2+ events within 10 km, last 2 years
- —
- largest
A proximity count, not an attribution. How to read it →
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15133268, documented in the API reference.