WELL · 42-151-33353 · DISTRICT 7

Y6 #1

Y

Fisher County · Judy Gail East (Canyon) field · Producing  · Vertical

Y6 #1 (API 42-151-33353) is a well in Fisher County operated by Sojourner Drilling Corporation, completed May 14, 2024 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued February 12, 2024, permitted to 5,000 ft.

Completion filings report 10 formation tops, including Coleman Junction, Noodle Creek - Disposal, Saddle Creek, Flippen - Disposal.

Its lease has reported 580K barrels of oil and 163K mcf of gas since January 1993, last reporting in July 2026. The lease carries 33 wells, so these are lease totals, not this well alone.

Operator of record

Sojourner Drilling Corporation

Abilene, TX · P-5 Y, filed Jul 4, 2026 · 872 permits on file · (325) 669-2068

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSojourner Drilling Corporation
Production reportsSojourner Drilling Corporationthrough Apr 2026
Latest permitSojourner Drilling CorporationFeb 12, 2024
5,000
total depth, ft
1
permits on file
Feb 12, 2024
last permit issued
May 14, 2024
completed
580K
cumulative oil, bbl
163K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 14, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

32.934595, -100.173823

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Fisher County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 33 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Y6 O-8-17470Judy Gail, East (Canyon)Sojourner Drilling Corporation33580K163KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 6,251 · prior 12 9,690(-35%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 242 · prior 12 209(+16%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Durango Operating Co., Inc.Jan 1993 → Sep 2001
  2. 2OK Arena Operating CompanyOct 2001 → Jul 2010
  3. 3Sandridge Expl. and Prod., LLCAug 2010 → Jan 2013
  4. 4Sheridan Production Company, LLCFeb 2013 → Mar 2020
  5. 5MWL Energy LLCJul 2020 → Mar 2024
  6. 6Sojourner Drilling CorporationApr 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
896824-99DrillSojourner Drilling CorporationJan 25, 2024Feb 12, 2024Feb 26, 20245,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-17470————

Formation tops

As filed on W-2/G-1. Subsea from 1,771 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionCOLEMAN JUNCTION - CORROSIVE; PO2,310-539
Noodle Creek - Disposal2,890-1,119
Saddle CreekSADDLE CREEK - DISPOSAL3,029-1,258
Flippen - Disposal3,082-1,311
CiscoCISCO (REEF, LIME, SAND) - DISPO3,227-1,456
Breckenridge - Disposal3,368-1,597
Crystal Falls - Disposal——
Dothan Sand - Disposal——
Hope - Disposal——
San AndresSAN ANDRES - DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
4,3534,359Perforated
4,4514,454Perforated
4,4574,461Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516412.25110 S
5.54,6577.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 2, 2024Jun 3, 2024Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Judy Gail42-151-33357

0.7 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction2,326-557
Breckenridge - Disposal3,499-1,730
Swastika - Disposal3,693-1,924
Canyon4,440-2,671
Cambrian - Disposal—
Strawn—
San Andres—
Ellenburger—

10 TOPS · FIRST 8

Judy Gail42-151-33359

1.2 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction2,342-558
Noodle Creek - Disposal2,921-1,137
Saddle Creek3,003-1,219
Flippen - Disposal3,078-1,294
Cisco3,272-1,488
Breckenridge - Disposal3,420-1,636
San Andres—
Hope - Disposal—

10 TOPS · FIRST 8

Scout42-151-33138

1.7 KM · Lainco, Inc. · Section with this well →

Coleman Junction2,040-267
Gunsight3,588-1,815
Swastika - Disposal3,608-1,835
Canyon4,568-2,795
Strawn5,316-3,543
Ellenburger—
Cambrian - Disposal—
San Andres—

10 TOPS · FIRST 8

York42-151-32606

1.8 KM · Walsh & Watts, Inc. · Section with this well →

San Andres5101,284
Coleman Junction2,500-706
Noodle Creek - Disposal2,655-861
Dothan Sand - Disposal2,961-1,167
Flippen3,120-1,326
Saddle Creek3,140-1,346
Cisco3,245-1,451
Hope - Disposal3,254-1,460

15 TOPS · FIRST 8

Wash42-151-33226

2.9 KM · Peregrine Petroleum Prtnr, Ltd. · Section with this well →

Coleman Junction3,116-1,340
Noodle Creek - Disposal3,731-1,955
Cisco4,457-2,681
Breckenridge - Disposal—
Crystal Falls - Disposal—
Dothan Sand - Disposal—
Flippen - Disposal—
Hope - Disposal—

10 TOPS · FIRST 8

Double M42-151-33217

3.5 KM · Peregrine Petroleum Prtnr, Ltd. · Section with this well →

Coleman Junction3,120-1,370
Noodle Creek - Disposal3,802-2,052
Cisco4,478-2,728
Canyon4,726-2,976
Strawn5,258-3,508
Ellenburger—
Dothan Sand - Disposal—
Cambrian - Disposal—

10 TOPS · FIRST 8

Scott42-151-33279

4.4 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction2,230-474
Noodle Creek - Disposal2,790-1,034
Saddle Creek2,970-1,214
Flippen - Disposal3,010-1,254
Hope - Disposal3,360-1,604
Breckenridge - Disposal3,480-1,724
Cisco3,510-1,754
Dothan Sand - Disposal—

10 TOPS · FIRST 8

Swenson42-151-02010

4.6 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction2,348-586
Noodle Creek - Disposal2,800-1,038
Saddle Creek2,890-1,128
Flippen - Disposal3,030-1,268
Cisco3,160-1,398
Crystal Falls - Disposal3,230-1,468
Hope - Disposal3,330-1,568
Breckenridge - Disposal3,400-1,638

11 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15133353, documented in the API reference.