TEXAS · WELLS · FOARD COUNTY · KINCAID-LEMONS "62" LEASE · API 42-155-30282 · DISTRICT 7C
Kincaid-Lemons 62 #B 1
Foard County · Rocky Wall (Congl.) field · Vertical
Kincaid-Lemons 62 #B 1 (API 42-155-30282) is a plugged well in Foard County, plugged April 24, 2003, last operated by Dry Fork Production CO. LLC.
The RRC has issued one drilling permit, issued September 8, 1981, permitted to 6,002 ft.
It was permitted by Scandrill CO. and has since transferred to Dry Fork Production CO. LLC on the wellbore schedule.
Its lease has reported 3.19K barrels of oil and 5.27K mcf of gas since January 1993, last reporting in August 2003.
Operator of record
Permitted by Scandrill Co.; the EWA schedule now lists a different operator.
- Based in
- Wichita Falls, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- May 1, 2026
- Permits on file
- 207
- Phone
- (940) 723-7052
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dry Fork Production Co. LLC |
| Production reports | H-M Resource Management, Inc.through Jun 2002 |
| Latest permit | Scandrill Co.Sep 8, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,002
- total depth, ft
- 1
- permits on file
- Sep 8, 1981
- last permit issued
- Aug 28, 1981
- completed
- 3.19K
- cumulative oil, bbl
- 5.27K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 28, 1981
- Shut in
- —
- Plugged
- Apr 24, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kincaid-Lemons "62" O-13-21432 | Rocky Wall (Congl.) | Dry Fork Production Co., LLC | 1 | 3.19K | 5.27K | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pyramid Energy, Inc.Jan 1993 → Jun 1994
- 2Rio Grande Drilling CompanyJul 1994 → Jan 1996
- 3H-M Resource Management, Inc.Feb 1996 → Jun 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 132593-99 | Drill | Scandrill Co. | Sep 8, 1981 | Sep 8, 1981 | — | 6,002 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 28, 1981 | Kincaid-Lemons 62 O-13-21432 | Rocky Wall (Congl.) | Dry Fork Production Co. LLC | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,760 | 5,766 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 552 | 12.25 | 250 S |
| 2.375 | 5,710 | — | — |
| 4.5 | 6,000 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Sep 28, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-155-30282 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-155-30282 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15530282, documented in the API reference.