WELL · 42-155-30291 · DISTRICT 9

Gamble, S. V. #1

N

Foard County  · Vertical

Gamble, S. V. #1 (API 42-155-30291) is a permitted well in Foard County filed by Mid-Continental Exploration,Inc.; no completion report is on file yet.

The RRC has issued 4 drilling permits between 1981 and 2000, permitted to 2,400 ft.

Completion filings report 4 formation tops, including Wichita-Albany, Coleman Junction, Cisco, Canyon.

Its 3 leases have reported 316 barrels of oil and 48.2K mcf of gas since January 1993, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Mid-Continental Exploration,inc.

Sanger, TX · P-5 Y, filed Feb 4, 2022 · 95 permits on file · (972) 571-0563

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsBlackbrush O & G, LLCthrough Apr 2026
Latest permitMid-Continental Exploration,inc.Oct 31, 2000
2,400
total depth, ft
4
permits on file
Oct 31, 2000
last permit issued
—
completed
316
cumulative oil, bbl
48.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gamble, S. V. G-13-193905Thalia (Wichita Falls)Blackbrush O & G, LLC1044.2KNov 2002 – Jul 2026
Gamble, S. V. G-13-177471Thalia (Cisco)MB Exploration, LLC103.96KJan 2000 – Nov 2002
Gamble, S.V. O-13-21847Thalia, N. (Canyon)Mid-Continental Exploration,inc.331656Jan 1993 – Jul 2000

Gas, mcf lease total

Last 12 months 192 · prior 12 202(-5%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mid-Continental Exploration,inc.Jan 1993 → Jan 2001
  2. 2MB Exploration, LLCNov 2002 → Jul 2008
  3. 3Palmer Petroleum Inc.Mar 2003 → Nov 2006
  4. 4Blackbrush O & G, Inc.Aug 2008 → Apr 2012
  5. 5Blackbrush O & G, LLCMay 2012 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
501438-99RecompletionMid-Continental Exploration,inc.Oct 31, 2000Oct 31, 2000Oct 30, 20021,000
491364-99RecompletionMid-Continental Exploration,inc.Jan 24, 2000Jan 26, 2000Jan 19, 20002,000
440803-99RecompletionMid-Continental Exploration,inc.Oct 12, 1995Oct 19, 1995—1,970
142648-99DrillNebo Oil CompanyDec 4, 1981Dec 4, 1981—2,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-177471————
—— G-13-193905————
—— O-13-21847————

Formation tops

As filed on W-2/G-1. Subsea from 1,381 ft elevation.Download CSV →

FormationMD ftSubsea
Wichita-AlbanyWICHITA FALLS910471
Coleman Junction1,070311
CiscoCISCO REEF1,870-489
Canyon2,075-694

Perforations

Perforated and open-hole intervals.

FromToType
879889Perforated
900910Perforated
916924Perforated
1,6921,698Perforated
1,7261,736Perforated
1,9922,062Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510012.5100 S
4.52,1007.875175 S
8.6259,73412.5100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 8, 2004Jan 20, 2004—
00May 7, 2003Jan 17, 2003Yes
00Apr 24, 2003——
00Aug 8, 2000Jun 13, 2000Yes
00Jul 10, 2000——
00Jan 12, 1984Feb 8, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15530291, documented in the API reference.