WELL · 42-155-30589 · DISTRICT 9
Mule Creek #1
Foard County · Crowell East (Strawn Reef) field · Vertical
Mule Creek #1 (API 42-155-30589) is a plugged well in Foard County, plugged January 3, 2008, last operated by Ginnings Company.
The RRC has issued 2 drilling permits between 1996 and 2004, permitted to 4,750 ft.
Completion filings report 3 formation tops, including B/Coleman Junction, Canyon, B/Stock.
Its 2 leases have reported 10.4K barrels of oil since March 1997, last reporting in May 2008. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Wichita Falls, TX · P-5 Y, filed May 4, 2026 · 67 permits on file · (940) 322-7829
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ginnings Company |
| Production reports | Ginnings Companythrough Mar 2004 |
| Latest permit | Ginnings CompanyFeb 19, 2004 |
- 4,750
- total depth, ft
- 2
- permits on file
- Feb 19, 2004
- last permit issued
- Mar 27, 1997
- completed
- 10.4K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1997 THROUGH May 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 27, 1997
- Shut in
- —
- Plugged
- Jan 3, 2008
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mule Creek O-13-30298 | Crowell, East (Canyon Reef) | Ginnings Company | 1 | 418 | 0 | Oct 2003 – May 2008 |
| Mule Creek O-13-29311 | Crowell, East (Strawn Reef) | Ginnings Company | 1 | 9.98K | 0 | Mar 1997 – Jun 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Walter Exploration Inc.Mar 1997 → Oct 1998
- 2Riggins Energy Inc.Nov 1998 → May 2001
- 3Starbuck EnergyJun 2001 → Aug 2002
- 4Ginnings CompanySep 2002 → Mar 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 538399-99 | Recompletion | Ginnings Company | Nov 7, 2003 | Feb 19, 2004 | Oct 8, 2003 | 4,060 |
| 455040-99 | Drill | Walter Exploration Inc. | Nov 12, 1996 | Nov 22, 1996 | Jan 16, 1997 | 4,750 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-29311 | — | — | — | — |
| — | — O-13-30298 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,430 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Coleman Junction | 3,182 | -1,752 |
| CanyonCANYON REEF | 3,312 | -1,882 |
| B/Stock | 3,391 | -1,961 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,312 | 3,314 | Perforated |
| 4,096 | 4,323 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 205 | 12.25 | 125 S |
| 5.5 | 4,453 | 7.875 | 475 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 14, 2004 | Oct 31, 2003 | Yes |
| 00 | May 7, 2004 | Mar 28, 1997 | Yes |
| 00 | Apr 16, 1997 | Mar 28, 1997 | Yes |
| 00 | Apr 7, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-155-30589 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-155-30589 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15530589, documented in the API reference.