WELL · 42-155-30793 · DISTRICT 9
Carroll #1
Foard County · Crowell North (Des Moines) field · Producing · Vertical
Carroll #1 (API 42-155-30793) is a well in Foard County operated by Williams A. Oil, completed January 7, 2015 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued September 22, 2014, permitted to 6,500 ft.
It was permitted by Menasco, J. and has since transferred to Williams A. Oil on the wellbore schedule.
Completion filings report 10 formation tops, including Coleman Junction, Canyon, Strawn, Raspberry.
Its lease has reported 57K barrels of oil since January 2015, last reporting in July 2026.
Operator of record
Permitted by Menasco, J.; the EWA schedule now lists a different operator.
Wichita Falls, TX · P-5 Y, filed Feb 4, 2026 · 5 permits on file · (940) 733-2579
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Williams A. Oil |
| Production reports | Williams, A. Oilthrough Mar 2026 |
| Latest permit | Menasco, J.Sep 22, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,500
- total depth, ft
- 1
- permits on file
- Sep 22, 2014
- last permit issued
- Jan 7, 2015
- completed
- 57K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2015 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 7, 2015
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carroll O-13-33133 | Crowell, North (Des Moines) | Williams, A. Oil | 1 | 57K | 0 | Jan 2015 – Jul 2026 |
Oil, barrels lease total
Last 12 months 2,490 · prior 12 2,710(-8%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Menasco, J.Jan 2015 → Jan 2015
- 2Williams, A. OilFeb 2015 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 796006-99 | Drill | Menasco, J. | Sep 10, 2014 | Sep 22, 2014 | Oct 5, 2014 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-33133 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Coleman JunctionCOLEMAN JUNCTION - CORROSIVE | 1,790 |
| Canyon | 4,530 |
| Strawn | 5,155 |
| Raspberry | 5,602 |
| BendBEND CONGLOMERATE | 5,662 |
| Caddo | — |
| Cisco | — |
| Gunsite | — |
| Palo Pinto | — |
| Tannehill | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,111 | 6,126 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 127 | 12.25 | 125 S |
| 5.5 | 6,343 | 7.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 5, 2015 | Jan 28, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-155-30793 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-155-30793 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15530793, documented in the API reference.