WELL · 42-157-02543 · DISTRICT 3

Booth T. R. #12

Shut in

Fort Bend County · Thompson field · Temp Abandoned  · Vertical

Booth T. R. #12 (API 42-157-02543) is a well in Fort Bend County operated by P.O.&G. Operating LLC, completed November 7, 2001 and listed as temp abandoned on the RRC schedule, shut in June 1, 2002.

The RRC has issued one drilling permit, issued February 13, 1998, permitted to 5,417 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to P.O.&G. Operating LLC on the wellbore schedule.

Its 2 leases have reported 39.6K barrels of oil and 198K mcf of gas since January 1993, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

P.o.&g. Operating LLC

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Nov 10, 2025
Permits on file
95
Phone
(713) 244-0779

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJetta Operating Company Inc.
Production reportsExxon Mobil Corporationthrough May 2002
Latest permitChevron U. S. A. Inc.Feb 13, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,417
total depth, ft
1
permits on file
Feb 13, 1998
last permit issued
Nov 7, 2001
completed
39.6K
cumulative oil, bbl
198K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 7, 2001
Shut in
Jun 1, 2002
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Booth, T. R. G-3-166968Thompson (Miocene 1-B)P.o.&g. Operating, LLC10154KJan 1998 – Jul 2026
Booth, T. R. O-3-4101Thompson (3600 Sand)Jetta Operating Company, Inc.439.6K44.3KJan 1993 – Nov 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jan 1993 → Jan 2000
  2. 2Exxon Corp.Feb 2000 → Mar 2000
  3. 3Exxon Mobil CorporationApr 2000 → May 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
472945-99RecompletionChevron U. S. A. Inc.Feb 4, 1998Feb 13, 1998Dec 24, 19973,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 7, 2001Booth T. R. G-3-166968ThompsonP.o.&g. Operating LLCTemp Abandoned · shut in Jun 1, 20025,417
Jan 3, 1991Booth T. R. O-3-4101Thompson (3600 Sand)Jetta Operating Company Inc.Not on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
2,1102,116Perforated
2,1402,156Perforated
3,1433,153Perforated
3,1803,194Perforated
3,1903,194Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
790——
10.75938—200 S
2.3753,101——
53,255—300 S
53,333—300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 18, 2002Feb 11, 2002—
00Mar 23, 1998Mar 6, 1998Yes
00Mar 12, 1998——
00Feb 26, 1991Feb 11, 1991—
00Jan 12, 1984Apr 11, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15702543, documented in the API reference.