TEXAS · WELLS · FORT BEND COUNTY · API 42-157-30003 · DISTRICT 03
Lockwood & Sharp -A- #2
Fort Bend County · Thompson field · Temp Abandoned · Vertical
Lockwood & Sharp -A- #2 (API 42-157-30003) is a well in Fort Bend County operated by P.O.&G. Operating LLC, completed March 29, 1990 and listed as temp abandoned on the RRC schedule, shut in February 1, 2005.
The RRC has issued 4 drilling permits between 1977 and 1993, permitted to 4,050 ft.
It was permitted by Exxon Corp. and has since transferred to P.O.&G. Operating LLC on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 10, 2025
- Permits on file
- 95
- Phone
- (713) 244-0779
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | P.o.&g. Operating LLC |
| Production reports | Jetta Operating Company, Inc.through Jan 2005 |
| Latest permit | Exxon Corp.Feb 12, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,050
- total depth, ft
- 4
- permits on file
- Feb 12, 1993
- last permit issued
- Mar 29, 1990
- completed
- 0
- cumulative oil, bbl
- 1.34M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 29, 1990
- Shut in
- Feb 1, 2005
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lockwood & Sharp -A- G-3-136788 | Wildcat | P.o.&g. Operating, LLC | 1 | 0 | 1.34M | Jan 1993 – Jul 2026 |
| — O-3-12700 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.May 1994 → Aug 1999
- 2Jetta Operating Company, Inc.Dec 2003 → Jan 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 408915-99 | Recompletion | Exxon Corp. | Feb 12, 1993 | Feb 12, 1993 | Mar 19, 1990 | 2,600 |
| 367319-99 | Recompletion | Exxon Corp. | Dec 6, 1989 | Dec 8, 1989 | — | 4,050 |
| 45484-99 | Recompletion | Exxon Corp. | Mar 28, 1979 | Mar 28, 1979 | — | 4,050 |
| 13952-99 | Recompletion | Exxon Corp. | Dec 13, 1977 | Dec 13, 1977 | — | 4,050 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 29, 1990 | Lockwood & Sharp -A- G-3-136788 | Thompson | P.o.&g. Operating LLC | Temp Abandoned · shut in Feb 1, 2005 | 4,050 |
| Mar 29, 1990 | Lockwood & Sharp -A- G-3-136788 | Thompson | P.o.&g. Operating LLC | Temp Abandoned · shut in Feb 1, 2005 | 4,050 |
| May 23, 1988 | Lockwood & Sharp A O-3-12700 | Thompson (Miocene 6 Seg 6) | Exxon Corp. | Not on Schedule | — |
| Mar 1, 1988 | Lockwood & Sharp A O-3-12700 | Thompson (Miocene 6 Seg 6) | Exxon Corp. | Not on Schedule | — |
| Mar 29, 1979 | Lockwood & Sharp A O-3-12700 | Thompson (Miocene 6 Seg 6) | Exxon Corp. | Not on Schedule | — |
| — | Lockwood & Sharp -A- G-3-75743 | Thompson (Miocene 13-D) | Exxon Corp. | Not on Schedule | — |
| — | Lockwood & Sharp -A- O-3-9576 | Thompson (Miocene 6 Seg 6) | Exxon Corp. | Not on Schedule | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,540 | 2,548 | Perforated |
| 2,693 | 2,707 | Perforated |
| 2,894 | 2,908 | Perforated |
| 3,265 | 3,277 | Perforated |
| 3,962 | 3,972 | Perforated |
| — | 3,310 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,570 | 12.25 | 550 S |
| 8.625 | 1,570 | — | — |
| 2.375 | 3,116 | — | — |
| 5.5 | 4,048 | 7.875 | 275 S |
| 5.5 | 4,048 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 19, 2004 | May 3, 2004 | — |
| 00 | Sep 12, 1994 | May 10, 1994 | Yes |
| 00 | May 7, 1991 | Jun 15, 1990 | Yes |
| 00 | Feb 7, 1991 | — | — |
| 00 | Jul 7, 1988 | Jun 27, 1988 | — |
| 00 | Apr 18, 1988 | Mar 30, 1988 | — |
| 00 | Apr 7, 1988 | Mar 7, 1986 | Yes |
| 00 | Apr 15, 1986 | Mar 7, 1986 | Yes |
| 00 | Jul 22, 1985 | Jun 4, 1985 | — |
| 00 | Jul 4, 1985 | Jan 28, 1980 | — |
| 00 | Jan 12, 1984 | Jan 28, 1980 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-157-30003 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-157-30003 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 49.6K
- bbl, all reported
- Jan 1994
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000054989 | W-14 Disposal | Canceled Jul 15, 1994 | 5,000 | 500 | 2,250–2,920 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15730003, documented in the API reference.