WELL · 42-157-30069 · DISTRICT 3
Robinson GU #4
Fort Bend County · Needville (Miocene 3154) field · Vertical
Robinson GU #4 (API 42-157-30069) is a plugged well in Fort Bend County, plugged June 11, 1998, last operated by Western Gulf Oil & Gas Inc..
The RRC has issued 2 drilling permits between 1982 and 1983, permitted to 5,218 ft.
It was permitted by Goldking Prod. CO. and has since transferred to Western Gulf Oil & Gas Inc. on the wellbore schedule.
Operator of record
Permitted by Goldking Prod. Co.; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Dec 6, 1999
- Permits on file
- 64
- Phone
- (214) 363-1428
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Goldking Prod. Co. |
| Production reports | none |
| Latest permit | Goldking Prod. Co.Sep 13, 1983 |
- 5,218
- total depth, ft
- 2
- permits on file
- Sep 13, 1983
- last permit issued
- Aug 26, 1983
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 26, 1983
- Shut in
- —
- Plugged
- Jun 11, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Robinson GU G-3-107894 | Needville (Miocene 3154) | Western Gulf Oil & Gas Inc. | 1 | 0 | 0 | Jan 1993 – Jun 1998 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 211921-99 | Recompletion | Goldking Prod. Co. | Sep 9, 1983 | Sep 13, 1983 | — | 5,218 |
| 166974-99 | Recompletion | Goldking Prod. Co. | Jul 23, 1982 | Jul 23, 1982 | — | 5,218 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 26, 1983 | Robinson GU G-3-107894 | Needville (Miocene 3154) | Western Gulf Oil & Gas Inc. | Plugged | — |
| Jul 26, 1982 | Robinson Gas Unit G-3-101822 | Needville (Miocene 3532) | Goldking Prod. Co. | Plugged | — |
| — | Robinson Gas Unit G-3-49838 | Needville (Miocene 4000 2ND) | Goldking Prod. Co. | Plugged | — |
| — | Robinson Gas Unit G-3-49912 | Needville (Miocene 3800) | Goldking Prod. Co. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,154 | 3,158 | Perforated |
| 3,520 | 3,532 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 505 | 12.25 | — |
| 2.375 | 3,065 | — | — |
| 2.375 | 3,400 | — | — |
| 4.5 | 5,218 | 7.875 | — |
| 4.5 | 5,235 | 7.875 | 1,367 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Sep 16, 1983 | — |
| 00 | Jan 12, 1984 | Aug 10, 1982 | — |
| 00 | Jan 12, 1984 | Mar 10, 1971 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-157-30069 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-157-30069 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15730069, documented in the API reference.