WELL · 42-157-31055 · DISTRICT 3
Lockwood-Sharp -B- #64
Fort Bend County · Thompson (3600 Sand) field · Vertical
Lockwood-Sharp -B- #64 (API 42-157-31055) is a plugged well in Fort Bend County, plugged September 28, 1999, last operated by Exxon Corp..
The RRC has issued 2 drilling permits (amended once) between 1979 and 1990, permitted to 5,950 ft.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.
Its 2 leases have reported 1.86M barrels of oil and 1.5M mcf of gas since January 1993, last reporting in July 2026. The leases carry 55 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Houston, TX
- P-5 status
- See remarks (S)
- P-5 last filed
- Mar 15, 1999
- Permits on file
- 19,549
- Phone
- (713) 431-1125
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | P.o.&g. Operating, LLCthrough Mar 2026 |
| Latest permit | Exxon Corp.Jan 8, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,950
- total depth, ft
- 3
- permits on file
- Jan 8, 1990
- last permit issued
- Sep 19, 1990
- completed
- 1.86M
- cumulative oil, bbl
- 1.5M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 19, 1990
- Shut in
- —
- Plugged
- Sep 28, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 55 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lockwood & Sharp -B- O-3-4118 | Thompson | P.o.&g. Operating, LLC | 52 | 1.84M | 1.49M | Jan 1993 – Jul 2026 |
| Lockwood-Sharp -B- O-3-4119 | Thompson (3600 Sand) | Exxon Corp. | 3 | 14.4K | 14K | Jan 1993 – Nov 1999 |
Oil, barrels lease total
Last 12 months 29,151 · prior 12 54,380(-46%)
Gas, mcf lease total
Last 12 months 10,492 · prior 12 29,579(-65%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Jun 2003
- 3Jetta Operating Company, Inc.Jul 2003 → May 2012
- 4Denbury Onshore, LLCJun 2012 → Jul 2024
- 5P.o.&g. Operating, LLCAug 2024 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 367435-98 | Recompletion | Exxon Corp. | Nov 16, 1990 | Jan 8, 1990 | Sep 4, 1990 | 5,465 |
| 367435-99 | Recompletion | Exxon Corp. | Dec 7, 1989 | Jan 8, 1990 | — | 5,465 |
| 67623-99 | Drill | Exxon Corp. | Dec 27, 1979 | Dec 27, 1979 | — | 5,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-4118 | — | — | — | — |
| — | — O-3-4119 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 60 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE 10 | 3,240 | -3,180 |
| Miocene (undifferentiated)MIOCENE 11 | 3,400 | -3,340 |
| Frio | 4,870 | -4,810 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,235 | 3,252 | Perforated |
| 3,252 | 3,256 | Perforated |
| 4,980 | 4,983 | Perforated |
| 5,016 | 5,025 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,544 | 14.75 | 925 S |
| 2.875 | 4,925 | — | — |
| 7 | 5,455 | 9.875 | 830 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 26, 1991 | Nov 28, 1990 | Yes |
| 00 | Feb 13, 1991 | Oct 5, 1990 | — |
| 00 | Feb 8, 1991 | Jul 20, 1989 | — |
| 00 | Aug 31, 1989 | Jul 20, 1989 | — |
| 00 | Jan 12, 1984 | Mar 10, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-157-31055 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-157-31055 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15731055, documented in the API reference.