WELL · 42-157-31081 · DISTRICT 3

Davis J. H. P. Est. #60

Plugged

Fort Bend County · Thompson S. (4400 Sand) field  · Vertical

Davis J. H. P. Est. #60 (API 42-157-31081) is a plugged well in Fort Bend County, plugged March 11, 1997, last operated by Jetta Operating Company Inc..

The RRC has issued 4 drilling permits between 1980 and 1988, permitted to 84,809 ft.

It was permitted by Exxon Corp. and has since transferred to Jetta Operating Company Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Mg-2, F1-A, F1-B, F1-C.

Its lease has reported 1.63M barrels of oil and 590K mcf of gas since January 1993, last reporting in June 2004. The lease carries 17 wells, so these are lease totals, not this well alone.

Operator of record

Jetta Operating Company Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
605
Phone
(817) 639-2332

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJetta Operating Company Inc.
Production reportsJetta Operating Company, Inc.through Oct 2003
Latest permitExxon Corp.Oct 11, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

84,809
total depth, ft
4
permits on file
Oct 11, 1988
last permit issued
Nov 6, 1988
completed
1.63M
cumulative oil, bbl
590K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2004

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 6, 1988
Shut in
—
Plugged
Mar 11, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 17 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis, J. H. P., Est. O-3-4155Thompson, S. (4400 Sand)Jetta Operating Company, Inc.171.63M590KJan 1993 – Jun 2004

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Jun 2003
  3. 3Jetta Operating Company, Inc.Jul 2003 → Oct 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
351330-99RecompletionExxon Corp.Sep 19, 1988Oct 11, 1988—5,450
325591-99RecompletionExxon Corp.Jan 19, 1987Feb 12, 1987—5,400
292130-99RecompletionExxon Corp.Nov 7, 1985Dec 5, 1985—84,809
76997-99DrillExxon Corp.Mar 25, 1980Mar 25, 1980May 20, 19805,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-4155————

Formation tops

As filed on W-2/G-1. Subsea from 65 ft elevation.Download CSV →

FormationMD ftSubsea
MG-25,162-5,097
F1-A5,188-5,123
F1-B5,215-5,150
F1-C5,238-5,173
F1-D5,259-5,194
F2-A5,310-5,245

Perforations

Perforated and open-hole intervals.

FromToType
4,2864,298Perforated
4,3324,342Perforated
5,1625,172Perforated
5,1885,192Perforated
5,2005,208Perforated
5,3115,315Perforated
5,3245,329Perforated
5,3705,380Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,42514.751,050 S
2.8755,265——
75,4489.875525 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 28, 1988Nov 17, 1988Yes
00Sep 1, 1988Aug 19, 1988—
00Jul 29, 1987Jul 13, 1987—
00Feb 25, 1986Jan 31, 1986Yes
00Feb 20, 1986——
00Jan 12, 1984Jul 2, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15731081, documented in the API reference.