TEXAS · WELLS · FORT BEND COUNTY · MCMILLIAN LEASE · API 42-157-32275 · DISTRICT 03

McMillian #2

Y

Fort Bend County · Fulshear S. (Cons.) field · Producing  · Directional

Mcmillian #2 (API 42-157-32275) is a well in Fort Bend County operated by Hilcorp Energy Company, completed November 16, 2004 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued May 17, 2004, permitted to 14,061 ft.

It was permitted by Conocophillips Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 6 formation tops, including Yegua, Cook Mountain, Weches, Reklaw.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Conocophillips Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Mar 2026
Latest permitConocophillips CompanyMay 17, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,061
total depth, ft
2
permits on file
May 17, 2004
last permit issued
Nov 16, 2004
completed
0
cumulative oil, bbl
4.65M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 16, 2004
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McMillian G-3-211909Fulshear, S. (Wilcox H)Hilcorp Energy Company104.65MNov 2004 – Jul 2026

Gas, mcf lease total

Last 12 months 7,474 · prior 12 8,989(-17%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conocophillips CompanyDec 2004 → Oct 2010
  2. 2Hilcorp Energy CompanyNov 2010 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
545638-98DrillConocophillips CompanyMay 30, 2005May 17, 2004Sep 10, 200414,600
545638-99DrillConocophillips CompanyMay 13, 2004May 17, 2004Sep 10, 200414,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 16, 2004McMillian G-3-211909Fulshear S. (Cons.)Hilcorp Energy CompanyProducing14,061

Formation tops

As filed on W-2/G-1. Subsea from 112 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua7,356-7,244
Cook Mountain8,211-8,099
Weches9,993-9,881
Reklaw10,630-10,518
Wilcox12,360-12,248
H Sand13,258-13,146

Perforations

Perforated and open-hole intervals.

FromToType
13,90013,940Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,53017.51,230 S
9.6258,48112.25440 S
712,3498.5140 S
3.514,6836390 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 20, 2006Jun 6, 2005Yes
00Nov 1, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15732275, documented in the API reference.