WELL · 42-159-30203 · DISTRICT 6

Hagansport Unit #1

Plugged

Franklin County · Talco field  · Vertical

Hagansport Unit #1 (API 42-159-30203) is a plugged well in Franklin County, plugged February 28, 2012, last operated by Arcadia Operating LLC.

The RRC has issued one drilling permit, issued October 18, 1978, permitted to 5,500 ft.

It was permitted by Taubert & Steed and has since transferred to Arcadia Operating LLC on the wellbore schedule.

Its 2 leases have reported 156K barrels of oil and 38 mcf of gas since January 1993, last reporting in July 2026. The leases carry 23 wells, so these are lease totals, not this well alone.

Operator of record

Arcadia Operating LLC

Permitted by Taubert & Steed; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Feb 9, 2026
Permits on file
46
Phone
(214) 446-1502

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsArcadia Operating, LLCthrough Feb 2025
Latest permitTaubert & SteedOct 18, 1978
5,500
total depth, ft
1
permits on file
Oct 18, 1978
last permit issued
Oct 7, 1983
completed
156K
cumulative oil, bbl
38
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 7, 1983
Shut in
—
Plugged
Feb 28, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 23 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hagansport Unit O-6-10491TalcoArcadia Operating, LLC21156K34Jan 1993 – Jul 2026
Nichols, Claude O-6-10601TalcoOto, Co.23004Jan 1993 – Jul 1995

Oil, barrels lease total

Last 12 months 0 · prior 12 1,449(-100%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Colorado Bluebonnet Energy Corp.Jan 1993 → May 1993
  2. 2Oto, Co.Jun 1993 → Sep 1996
  3. 3Texeast Operating Co., Inc.Oct 1996 → Feb 1998
  4. 4RGP ProductionAug 1998 → Dec 1998
  5. 5Gulftex Operating IncJan 1999 → May 2008
  6. 6Arcadia Expl. & Prod. CompanyJun 2008 → Dec 2010
  7. 7Arcadia Operating, LLCJan 2011 → Feb 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
35504-99DrillTaubert & SteedOct 18, 1978Oct 18, 1978Dec 1, 19785,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 7, 1983Hagansport Unit O-6-10491TalcoArcadia Operating LLCPlugged—
Oct 7, 1983Nichols Claude O-6-10601TalcoOto Co.Plugged—
Feb 1, 1979Nichols Claude O-6-10120Talco West (Paluxy)Taubert & SteedPlugged—
Feb 16, 1978Nichols Claude O-6-10601TalcoOto Co.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
4,3354,460Perforated
4,3384,340Perforated
—4,338Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522212.25165 S
2.8753,820——
4.54,5007.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 16, 1995Oct 26, 1983—
00Jan 12, 1984Oct 26, 1983—
00Jan 12, 1984Feb 22, 1979—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.28M
bbl, all reported
Jun 2012
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000049323H-1 InjectionPlugged Mar 28, 2012000–0
000049688H-1 InjectionPlugged Mar 28, 20121,5001,5003,840–4,460

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120112012

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930203, documented in the API reference.