WELL · 42-159-30213 · DISTRICT 6

Hagansport Unit #1

Plugged

Franklin County · Talco field  · Vertical

Hagansport Unit #1 (API 42-159-30213) is a plugged well in Franklin County, plugged November 6, 2008, last operated by Arcadia Operating LLC.

The RRC has issued one drilling permit, issued April 17, 1979, permitted to 5,500 ft.

It was permitted by Taubert & Steed and has since transferred to Arcadia Operating LLC on the wellbore schedule.

Its 2 leases have reported 156K barrels of oil and 41 mcf of gas since January 1993, last reporting in July 2026. The leases carry 23 wells, so these are lease totals, not this well alone.

Operator of record

Arcadia Operating LLC

Permitted by Taubert & Steed; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Feb 9, 2026
Permits on file
46
Phone
(214) 446-1502

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleArcadia Operating LLC
Production reportsArcadia Operating, LLCthrough Feb 2025
Latest permitTaubert & SteedApr 17, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,500
total depth, ft
1
permits on file
Apr 17, 1979
last permit issued
Aug 28, 1979
completed
156K
cumulative oil, bbl
41
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 28, 1979
Shut in
—
Plugged
Nov 6, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 23 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hagansport Unit O-6-10491TalcoArcadia Operating, LLC21156K34Jan 1993 – Jul 2026
Jennings, V.W. O-6-10602TalcoOto, Co.23237Jan 1993 – Jul 1995

Oil, barrels lease total

Last 12 months 0 · prior 12 1,449(-100%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Colorado Bluebonnet Energy Corp.Jan 1993 → May 1993
  2. 2Oto, Co.Jun 1993 → Sep 1996
  3. 3Texeast Operating Co., Inc.Oct 1996 → Feb 1998
  4. 4RGP ProductionAug 1998 → Dec 1998
  5. 5Gulftex Operating IncJan 1999 → May 2008
  6. 6Arcadia Expl. & Prod. CompanyJun 2008 → Dec 2010
  7. 7Arcadia Operating, LLCJan 2011 → Feb 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
47758-99DrillTaubert & SteedApr 17, 1979Apr 17, 1979Jun 1, 19795,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 28, 1979Hagansport Unit O-6-10491TalcoArcadia Operating LLCPlugged—
Aug 28, 1979Jennings V.W. O-6-10602TalcoOto Co.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
4,2704,400Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522611175 S
2.3754,320——
4.54,5107.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 16, 1995Sep 10, 1979—
00Jan 12, 1984Sep 10, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
486K
bbl, all reported
Jun 2008
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000045631H-1 InjectionPlugged Dec 8, 20081,0001,5004,270–4,400

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120072008

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930213, documented in the API reference.