TEXAS · WELLS · FRANKLIN COUNTY · NEW HOPE DEEP UNIT LEASE · API 42-159-30219 · DISTRICT 06

New Hope Deep Unit #4-5-D

Plugged

Franklin County · New Hope (Smackover) field  · Vertical

New Hope Deep Unit #4-5-D (API 42-159-30219) is a plugged well in Franklin County, plugged December 10, 2021, last operated by Xto Energy Inc..

The RRC has issued one drilling permit, issued August 24, 1979, permitted to 12,600 ft.

It was permitted by Getty Oil CO. and has since transferred to Xto Energy Inc. on the wellbore schedule.

Operator of record

XTO Energy Inc.

Permitted by Getty Oil Co.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Jun 2019
Latest permitGetty Oil Co.Aug 24, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,600
total depth, ft
1
permits on file
Aug 24, 1979
last permit issued
Dec 30, 1979
completed
0
cumulative oil, bbl
2.58M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 30, 1979
Shut in
—
Plugged
Dec 10, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
New Hope Deep Unit G-6-86160New Hope (Smackover)XTO Energy Inc.102.58MJan 1993 – Nov 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Aug 2004
  3. 3XTO Energy Inc.Sep 2004 → Jun 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
58125-99DrillGetty Oil Co.Aug 24, 1979Aug 24, 1979Oct 2, 197912,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 30, 1979New Hope Deep Unit G-6-86160New Hope (Smackover)XTO Energy Inc.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
12,21612,322Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
204124135 S
13.37592017.5—
9.6257,88512.25—
7.6258,4748.75—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jan 16, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930219, documented in the API reference.