TEXAS · WELLS · FRANKLIN COUNTY · NEW HOPE DEEP UNIT LEASE · API 42-159-30457 · DISTRICT 06

New Hope Deep Unit #6060D

Y

Franklin County · New Hope (Smackover) field · Producing  · Vertical

New Hope Deep Unit #6060D (API 42-159-30457) is a well in Franklin County operated by J.P. Oil Company Inc., completed May 27, 1989 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1988 and 1989, permitted to 12,450 ft.

It was permitted by Texaco Producing Inc. and has since transferred to J.P. Oil Company Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Woodbine, Paluxy, Pittsburg, Cotton Valley.

No lease production has been reported under this well’s leases.

Operator of record

J.P. Oil Company Inc.

Permitted by Texaco Producing Inc.; the EWA schedule now lists a different operator.

Based in
Lafayette, LA
P-5 status
Active (A)
P-5 last filed
May 5, 2026
Phone
(337) 234-1170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ.P. Oil Company Inc.
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitTexaco Producing Inc.Mar 13, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,450
total depth, ft
2
permits on file
Mar 13, 1989
last permit issued
May 27, 1989
completed
0
cumulative oil, bbl
6.94M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 27, 1989
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
New Hope Deep Unit G-6-131094New Hope (Smackover)J.P. Oil Company, Inc.106.94MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 41,609 · prior 12 51,710(-20%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Aug 2004
  3. 3XTO Energy Inc.Sep 2004 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
356274-99DrillTexaco Producing Inc.Feb 22, 1989Mar 13, 1989—13,600
342679-99DrillTexaco Producing Inc.Feb 16, 1988Feb 18, 1988—13,600

Completions

CompletedLeaseFieldOperatorStatusDepth
May 27, 1989New Hope Deep Unit G-6-131094New Hope (Smackover)J.P. Oil Company Inc.Producing12,450

Formation tops

As filed on W-2/G-1. Subsea from 452 ft elevation.Download CSV →

FormationMD ftSubsea
Woodbine4,300-3,848
Paluxy5,802-5,350
Pittsburg7,930-7,478
Cotton Valley9,368-8,916
Smackover11,788-11,336

Perforations

Perforated and open-hole intervals.

FromToType
11,79812,217Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2054——
13.37590017.51,125 S
9.6254,89212.25600 S
5.512,4508.51,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 13, 1989Jun 7, 1989Yes
00Jul 8, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930457, documented in the API reference.