TEXAS · WELLS · FRANKLIN COUNTY · API 42-159-30463 · DISTRICT 06

Talco West Unit #1

Shut in

Franklin County · Talco field · Shut In  · Vertical

Talco West Unit #1 (API 42-159-30463) is a well in Franklin County operated by J.P. Oil Company Inc., completed February 15, 1991 and listed as shut in on the RRC schedule, shut in July 1, 2008.

The RRC has issued one drilling permit, issued June 6, 1989, permitted to 4,500 ft.

It was permitted by Exxon Corp. and has since transferred to J.P. Oil Company Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Nacatoch, Pecan Gap, Eagle Ford, Woodbine.

Its 2 leases have reported 4M barrels of oil since January 1993, last reporting in July 2026. The leases carry 248 wells, so these are lease totals, not this well alone.

Operator of record

J.P. Oil Company Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Lafayette, LA
P-5 status
Active (A)
P-5 last filed
May 5, 2026
Phone
(337) 234-1170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ.P. Oil Company Inc.
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitExxon Corp.Jun 6, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,500
total depth, ft
1
permits on file
Jun 6, 1989
last permit issued
Feb 15, 1991
completed
4M
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 15, 1991
Shut in
Jul 1, 2008
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 248 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Talco West Unit O-6-15028TalcoJ.P. Oil Company, Inc.2473.99M0Jul 2011 – Jul 2026
Exxon Penn Fee OU 2 O-6-12840TalcoExxon Mobil Corporation18.18K0Jan 1993 – Jul 2011

Oil, barrels lease total

Last 12 months 164,335 · prior 12 186,765(-12%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Mobil CorporationJun 2005 → Dec 2013
  2. 2XTO Energy Inc.Jan 2014 → Oct 2023
  3. 3J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
360116-99DrillExxon Corp.Jun 6, 1989Jun 6, 1989Nov 3, 19904,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 15, 1991Talco West Unit O-6-15028TalcoJ.P. Oil Company Inc.Shut In · shut in Jul 1, 20084,500
Feb 15, 1991Exxon Penn Fee OU 2 O-6-12840TalcoExxon Mobil CorporationNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 382 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatoch435-53
Pecan Gap1,308-926
Eagle FordEAGLEFORD2,494-2,112
Woodbine2,904-2,522
Goodland4,245-3,863
Paluxy4,266-3,884

Perforations

Perforated and open-hole intervals.

FromToType
4,2784,285Perforated
4,3414,349Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7512514.75175 S
74,4799.8751,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 20, 2011Apr 1, 1991Yes
00May 17, 1991Apr 1, 1991Yes
00May 8, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930463, documented in the API reference.