WELL · 42-159-30467 · DISTRICT 6

Talco West Unit #1

Y

Franklin County · Talco field · Producing  · Vertical

Talco West Unit #1 (API 42-159-30467) is a well in Franklin County operated by J.P. Oil Company Inc., completed January 11, 1990 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 20, 1989, permitted to 4,440 ft.

It was permitted by Exxon Corp. and has since transferred to J.P. Oil Company Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Nacatoch, Pecan Gap, Eagle Ford, Woodbine.

Its 2 leases have reported 4.07M barrels of oil and 23 mcf of gas since January 1993, last reporting in July 2026. The leases carry 248 wells, so these are lease totals, not this well alone.

Operator of record

J.P. Oil Company Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Lafayette, LA
P-5 status
Active (A)
P-5 last filed
May 5, 2026
Phone
(337) 234-1170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitExxon Corp.Jul 20, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,440
total depth, ft
1
permits on file
Jul 20, 1989
last permit issued
Jan 11, 1990
completed
4.07M
cumulative oil, bbl
23
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 11, 1990
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 248 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Talco West Unit O-6-15028TalcoJ.P. Oil Company, Inc.2473.99M0Jul 2011 – Jul 2026
Terry OU 2 O-6-12690TalcoExxon Mobil Corporation177K23Jan 1993 – Oct 2011

Oil, barrels lease total

Last 12 months 164,335 · prior 12 186,765(-12%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2013
  3. 3XTO Energy Inc.Jan 2014 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
361760-99DrillExxon Corp.Jul 20, 1989Jul 20, 1989Dec 31, 19894,440

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 11, 1990Talco West Unit O-6-15028TalcoJ.P. Oil Company Inc.Producing4,440
Jan 11, 1990Terry OU 2 O-6-12690TalcoExxon Mobil CorporationNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 386 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatoch783-397
Pecan Gap1,680-1,294
Eagle FordEAGLEFORD2,950-2,564
Woodbine3,490-3,104
Goodland4,194-3,808
Paluxy4,218-3,832

Perforations

Perforated and open-hole intervals.

FromToType
4,2344,244Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7512514.75175 S
74,4339.8751,155 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 20, 2011Feb 9, 1990Yes
00May 15, 1990Feb 9, 1990Yes
00May 12, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930467, documented in the API reference.