TEXAS · WELLS · FRANKLIN COUNTY · NEW HOPE DEEP UNIT LEASE · API 42-159-30468 · DISTRICT 06

New Hope Deep Unit #104D

Y

Franklin County · New Hope (Smackover) field · Producing  · Directional · Sidetrack

New Hope Deep Unit #104D (API 42-159-30468) is a well in Franklin County operated by J.P. Oil Company Inc., completed November 16, 1989 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1989 and 1997, permitted to 12,500 ft.

It was permitted by Texaco E & P Inc. and has since transferred to J.P. Oil Company Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Woodbine, Paluxy, M. Anhy., Pittsburg.

No lease production has been reported under this well’s leases.

Operator of record

J.P. Oil Company Inc.

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
Lafayette, LA
P-5 status
Active (A)
P-5 last filed
May 5, 2026
Phone
(337) 234-1170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ.P. Oil Company Inc.
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitTexaco E & P Inc.Jan 17, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,500
total depth, ft
2
permits on file
Jan 17, 1997
last permit issued
Nov 16, 1989
completed
0
cumulative oil, bbl
5.01M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 16, 1989
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
New Hope Deep Unit G-6-132774New Hope (Smackover)J.P. Oil Company, Inc.105.01MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 34,959 · prior 12 40,768(-14%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Aug 2004
  3. 3XTO Energy Inc.Sep 2004 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
457420-99Recompletion · sidetrackTexaco E & P Inc.Jan 15, 1997Jan 17, 1997—12,850
362317-99DrillTexaco Producing Inc.Aug 3, 1989Aug 7, 1989—13,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 16, 1989New Hope Deep Unit G-6-132774New Hope (Smackover)J.P. Oil Company Inc.Producing12,500

Formation tops

As filed on W-2/G-1. Subsea from 389 ft elevation.Download CSV →

FormationMD ftSubsea
Woodbine4,000-3,611
Paluxy5,800-5,411
M. Anhy.7,180-6,791
Pittsburg7,920-7,531
Cotton Valley11,120-10,731
Smackover12,000-11,611

Perforations

Perforated and open-hole intervals.

FromToType
12,00312,251Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
205126125 S
13.37590017.5915 S
9.6257,81012.25900 S
5.512,5008.51,300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 15, 1990Nov 30, 1989Yes
00Jan 9, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930468, documented in the API reference.