WELL · 42-159-30483 · DISTRICT 6

New Hope Deep Unit #7004

N

Franklin County · New Hope (Smackover) field  · Vertical

New Hope Deep Unit #7004 (API 42-159-30483) is a well in Franklin County operated by Texaco E & P Inc., completed March 17, 1993.

The RRC has issued 2 drilling permits between 1992 and 1996, permitted to 15,000 ft.

Completion filings report 6 formation tops, including Woodbine, Paluxy, Mass Anhy, Pittsburg.

Its 2 leases have reported 476K barrels of oil and 251K mcf of gas since January 1993, last reporting in July 2026. The leases carry 22 wells, so these are lease totals, not this well alone.

Operator of record

Texaco E & P Inc.

Based in
Houston, TX
P-5 status
Delinquent (D)
P-5 last filed
Jan 22, 2003
Permits on file
3,332
Phone
(281) 561-3713

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexaco E & P Inc.
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitTexaco E & P Inc.Oct 9, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,000
total depth, ft
2
permits on file
Oct 9, 1996
last permit issued
Mar 17, 1993
completed
476K
cumulative oil, bbl
251K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 17, 1993
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 22 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
New Hope Unit O-6-1126New Hope (Bacon Lime)J.P. Oil Company, Inc.21476K241KJan 1993 – Jul 2026
New Hope Deep Unit G-6-145048New Hope (Smackover)Texaco E & P Inc.1010.5KMar 1993 – Mar 1996

Oil, barrels lease total

Last 12 months 6,546 · prior 12 5,461(+20%)

05001K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 483(-100%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Aug 2004
  3. 3XTO Energy Inc.Sep 2004 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
453123-99RecompletionTexaco E & P Inc.Sep 25, 1996Oct 9, 1996Mar 15, 199610,500
404537-99DrillTexaco E & P Inc.Oct 12, 1992Oct 13, 1992Jan 8, 199315,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-145048————
—— O-6-1126————

Formation tops

As filed on W-2/G-1. Subsea from 463 ft elevation.Download CSV →

FormationMD ftSubsea
Woodbine3,960-3,497
Paluxy5,763-5,300
Mass Anhy7,150-6,687
Pittsburg7,889-7,426
Cotton Valley11,080-10,617
Smackover11,800-11,337

Perforations

Perforated and open-hole intervals.

FromToType
7,4127,421Perforated
11,96012,391Perforated
12,05812,372Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2060——
13.37591517.5825 S
9.6254,91712.251,195 S
5.512,5808.752,625 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 14, 1997Nov 6, 1996Yes
00Dec 4, 1996——
00May 20, 1993Apr 13, 1993Yes
00May 11, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930483, documented in the API reference.