TEXAS · WELLS · FRANKLIN COUNTY · NEW HOPE DEEP UNIT LEASE · API 42-159-30484 · DISTRICT 06

New Hope Deep Unit #3 2 D

Y

Franklin County · New Hope (Smackover) field · Producing  · Vertical

New Hope Deep Unit #3 2 D (API 42-159-30484) is a well in Franklin County operated by J.P. Oil Company Inc., completed February 11, 1993 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued November 19, 1992, permitted to 12,650 ft.

It was permitted by Texaco E & P Inc. and has since transferred to J.P. Oil Company Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Woodbine, Paluxy, Mass. Anhyd, Pittsburg.

No lease production has been reported under this well’s leases.

Operator of record

J.P. Oil Company Inc.

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
Lafayette, LA
P-5 status
Active (A)
P-5 last filed
May 5, 2026
Phone
(337) 234-1170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ.P. Oil Company Inc.
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitTexaco E & P Inc.Nov 19, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,650
total depth, ft
1
permits on file
Nov 19, 1992
last permit issued
Feb 11, 1993
completed
0
cumulative oil, bbl
5.65M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 11, 1993
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
New Hope Deep Unit G-6-144417New Hope (Smackover)J.P. Oil Company, Inc.105.65MFeb 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 46,929 · prior 12 53,549(-12%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Feb 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Aug 2004
  3. 3XTO Energy Inc.Sep 2004 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
406250-99DrillTexaco E & P Inc.Nov 18, 1992Nov 19, 1992Dec 1, 199215,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 11, 1993New Hope Deep Unit G-6-144417New Hope (Smackover)J.P. Oil Company Inc.Producing12,650

Formation tops

As filed on W-2/G-1. Subsea from 352 ft elevation.Download CSV →

FormationMD ftSubsea
Woodbine3,963-3,611
Paluxy5,763-5,411
Mass. Anhyd7,143-6,791
Pittsburg7,883-7,531
Cotton Valley11,083-10,731
Smackover11,804-11,452

Perforations

Perforated and open-hole intervals.

FromToType
11,85512,030Perforated
12,08912,246Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2060——
13.37592317.5825 S
9.6254,90812.51,075 S
5.512,6508.752,225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 30, 1993Feb 25, 1993Yes
00Mar 25, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930484, documented in the API reference.