TEXAS · WELLS · FRANKLIN COUNTY · NEW HOPE DEEP UNIT LEASE · API 42-159-30506 · DISTRICT 06

New Hope Deep Unit #16D

Y

Franklin County · New Hope (Smackover) field · Producing  · Vertical

New Hope Deep Unit #16D (API 42-159-30506) is a well in Franklin County operated by J.P. Oil Company Inc., completed April 25, 1998 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 19, 1997, permitted to 12,350 ft.

It was permitted by Texaco E & P Inc. and has since transferred to J.P. Oil Company Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Woodbine, Paluxy, Mass. Anhyd., Pittsburg.

No lease production has been reported under this well’s leases.

Operator of record

J.P. Oil Company Inc.

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
Lafayette, LA
P-5 status
Active (A)
P-5 last filed
May 5, 2026
Phone
(337) 234-1170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ.P. Oil Company Inc.
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitTexaco E & P Inc.Dec 19, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,350
total depth, ft
1
permits on file
Dec 19, 1997
last permit issued
Apr 25, 1998
completed
0
cumulative oil, bbl
2.46M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 25, 1998
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
New Hope Deep Unit G-6-169225New Hope (Smackover)J.P. Oil Company, Inc.102.46MApr 1998 – Jul 2026

Gas, mcf lease total

Last 12 months 25,005 · prior 12 29,317(-15%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Apr 1998 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Aug 2004
  3. 3XTO Energy Inc.Sep 2004 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
471238-99DrillTexaco E & P Inc.Dec 15, 1997Dec 19, 1997Mar 1, 199812,850

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 25, 1998New Hope Deep Unit G-6-169225New Hope (Smackover)J.P. Oil Company Inc.Producing12,350

Formation tops

As filed on W-2/G-1. Subsea from 419 ft elevation.Download CSV →

FormationMD ftSubsea
Woodbine3,963-3,544
Paluxy5,714-5,295
Mass. Anhyd.7,138-6,719
Pittsburg7,878-7,459
Cotton Vly9,485-9,066
Smackover11,851-11,432

Perforations

Perforated and open-hole intervals.

FromToType
12,00812,196Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2060——
13.37593717.5750 S
9.6254,84712.251,100 S
4.512,3507.875975 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 21, 1998Jul 10, 1998Yes
00Aug 10, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930506, documented in the API reference.