WELL · 42-159-30518 · DISTRICT 6

Talco West Unit #1H

Plugged

Franklin County · Talco field  · Horizontal

Talco West Unit #1H (API 42-159-30518) is a plugged horizontal well in Franklin County, plugged May 23, 2011, last operated by J.P. Oil Company Inc..

The RRC has issued one drilling permit, issued June 6, 2002, permitted to 4,500 ft.

It was permitted by Exxon Mobil Corporation and has since transferred to J.P. Oil Company Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Washitagrp, Gooland, Toe, Heel.

Its 2 leases have reported 4.18M barrels of oil since September 2002, last reporting in July 2026. The leases carry 250 wells, so these are lease totals, not this well alone.

Operator of record

J.P. Oil Company Inc.

Permitted by Exxon Mobil Corporation; the EWA schedule now lists a different operator.

Based in
Lafayette, LA
P-5 status
Active (A)
P-5 last filed
May 5, 2026
Phone
(337) 234-1170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ.P. Oil Company Inc.
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitExxon Mobil CorporationJun 6, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,500
total depth, ft
1
permits on file
Jun 6, 2002
last permit issued
Oct 13, 2002
completed
4.18M
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 13, 2002
Shut in
—
Plugged
May 23, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 250 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Talco West Unit O-6-15028TalcoJ.P. Oil Company, Inc.2473.99M0Jul 2011 – Jul 2026
H. C. Barker Oil Unit 1 O-6-14191TalcoExxon Mobil Corporation3184K0Sep 2002 – Jul 2011

Oil, barrels lease total

Last 12 months 164,335 · prior 12 186,765(-12%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Mobil CorporationSep 2002 → Dec 2013
  2. 2XTO Energy Inc.Jan 2014 → Oct 2023
  3. 3J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
520523-99DrillExxon Mobil CorporationMay 31, 2002Jun 6, 2002Jul 24, 20024,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 13, 2002Talco West Unit O-6-15028TalcoJ.P. Oil Company Inc.Plugged—
Oct 13, 2002H. C. Barker Oil Unit 1 O-6-14191TalcoExxon Mobil CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 360 ft elevation.Download CSV →

FormationMD ftSubsea
Washitagrp3,400-3,040
Gooland4,143-3,783
Toe4,210-3,850
Heel4,216-3,856
Paluxy4,400-4,040

Perforations

Perforated and open-hole intervals.

FromToType
4,9117,163Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62590812.25395 S
74,7248.751,395 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 20, 2011Nov 25, 2002Yes
00Jan 16, 2003Nov 25, 2002Yes
00Dec 11, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930518, documented in the API reference.