TEXAS · WELLS · FRANKLIN COUNTY · API 42-159-80014 · DISTRICT 06

New Hope Unit #31

Y

Franklin County · New Hope field · Producing  · Vertical

New Hope Unit #31 (API 42-159-80014) is a well in Franklin County operated by J.P. Oil Company Inc., completed January 25, 1994 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued February 15, 1994, permitted to 8,241 ft.

It was permitted by Texaco E & P Inc. and has since transferred to J.P. Oil Company Inc. on the wellbore schedule.

Its 2 leases have reported 2.67M barrels of oil and 3.25M mcf of gas since January 1993, last reporting volume in March 2026. The leases carry 57 wells, so these are lease totals, not this well alone.

Operator of record

J.P. Oil Company Inc.

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
Lafayette, LA
P-5 status
Active (A)
P-5 last filed
May 5, 2026
Phone
(337) 234-1170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ.P. Oil Company Inc.
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitTexaco E & P Inc.Feb 15, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,241
total depth, ft
1
permits on file
Feb 15, 1994
last permit issued
—
completed
2.67M
cumulative oil, bbl
3.25M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
—
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 57 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
New Hope Unit O-6-1120New HopeJ.P. Oil Company, Inc.401.59M729KJan 1993 – Mar 2026
New Hope Unit O-6-5897New Hope (Elledge)J.P. Oil Company, Inc.171.08M2.52MJan 1993 – Mar 2026

Oil, barrels lease total

Last 12 months 42,432 · prior 12 46,655(-9%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 54,497 · prior 12 66,097(-18%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Aug 2004
  3. 3XTO Energy Inc.Sep 2004 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
420723-99RecompletionTexaco E & P Inc.Feb 1, 1994Feb 15, 1994Jan 10, 19948,180

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 25, 1994New Hope Unit O-6-5897New Hope (Elledge)J.P. Oil Company Inc.Shut In · shut in Sep 1, 20268,241
—New Hope Unit O-6-1120New HopeJ.P. Oil Company Inc.Producing8,241

Perforations

Perforated and open-hole intervals.

FromToType
8,1518,167Perforated

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 25, 1994Feb 16, 1994Yes
00Aug 10, 1994——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15980014, documented in the API reference.