TEXAS · WELLS · FREESTONE COUNTY · STEWARDS MILL GAS UNIT #2 LEASE · API 42-161-30115 · DISTRICT 05
Stewards Mill Gas Unit #2 #1
Freestone County · Stewards Mill (Travis Peak) field · Vertical
Stewards Mill Gas Unit #2 #1 (API 42-161-30115) is a plugged well in Freestone County, plugged February 1, 1993, last operated by Marathon Oil Company.
The RRC has issued 2 drilling permits between 1981 and 1985, permitted to 13,117 ft.
It was permitted by Txo Production Corp. and has since transferred to Marathon Oil Company on the wellbore schedule.
Completion filings report 5 formation tops, including Pettit, Travis Peak, Bossier, Cotton Valley.
Operator of record
Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Aug 14, 2025
- Permits on file
- 3,707
- Phone
- (281) 293-1000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Marathon Oil Company |
| Production reports | Marathon Oil Companythrough Jan 1993 |
| Latest permit | TXO Production Corp.Aug 21, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,117
- total depth, ft
- 2
- permits on file
- Aug 21, 1985
- last permit issued
- Sep 17, 1985
- completed
- 0
- cumulative oil, bbl
- 46
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 17, 1985
- Shut in
- —
- Plugged
- Feb 1, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Stewards Mill Gas Unit #2 G-5-118591 | Stewards Mill (Travis Peak) | Marathon Oil Company | 1 | 0 | 46 | Jan 1993 – Apr 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Marathon Oil CompanyJan 1993 → Jan 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 283028-99 | Recompletion | TXO Production Corp. | Aug 21, 1985 | Aug 21, 1985 | — | 13,117 |
| 146205-99 | Recompletion | TXO Production Corp. | Dec 31, 1981 | Dec 31, 1981 | — | 13,117 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 17, 1985 | Stewards Mill Gas Unit #2 G-5-118591 | Stewards Mill (Travis Peak) | Marathon Oil Company | Plugged | — |
| May 13, 1981 | Stewards Mill Gas Unit #2 G-5-96328 | Stewards Mill (Bossier SD) | TXO Production Corp. | Plugged | — |
| Jun 27, 1975 | Stewards Mill Gas Unit #2 G-5-68736 | Stewards Mill (Cotton Valley LM) | TXO Production Corp. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 316 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pettit | 7,550 | -7,234 |
| Travis Peak | 7,750 | -7,434 |
| BossierBOSSIER SHALE | 10,600 | -10,284 |
| Cotton ValleyCOTTON VALLEY LIME | 11,398 | -11,082 |
| Smackover | 12,200 | -11,884 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,028 | 8,046 | Perforated |
| 10,802 | 10,879 | Perforated |
| 11,406 | 11,504 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 73 | 17.25 | 8 S |
| 13.375 | 73 | — | — |
| 8.625 | 4,552 | 12.25 | 1,760 S |
| 8.625 | 4,552 | — | — |
| 2.875 | 10,584 | — | — |
| 5.5 | 11,736 | 7.875 | 975 S |
| 5.5 | 11,736 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 14, 1985 | Oct 15, 1985 | — |
| 00 | Nov 2, 1985 | — | — |
| 00 | Jan 12, 1984 | Dec 2, 1981 | — |
| 00 | Jan 12, 1984 | Oct 26, 1976 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-161-30115 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-161-30115 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16130115, documented in the API reference.