WELL · 42-161-30440 · DISTRICT 5
Reed E Gas Unit #1
Freestone County · Bear Grass (Travis Peak) field · Vertical
Reed E Gas Unit #1 (API 42-161-30440) is a plugged well in Freestone County, plugged November 1, 2012, last operated by Xto Energy Inc..
The RRC has issued 4 drilling permits between 1978 and 2004, permitted to 16,000 ft.
Completion filings report 6 formation tops, including Austin Chalk, Woodbine, Bma/Rodessa, Pettit.
Operator of record
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Aug 2010 |
| Latest permit | XTO Energy Inc.Jul 22, 2004 |
- 16,000
- total depth, ft
- 4
- permits on file
- Jul 22, 2004
- last permit issued
- Feb 2, 2005
- completed
- 0
- cumulative oil, bbl
- 84.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 2, 2005
- Shut in
- —
- Plugged
- Nov 1, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Reed "E" G-5-151167 | Bear Grass (Pettit) | XTO Energy Inc. | 1 | 0 | 3.53K | Apr 1994 – Oct 2012 |
| Reed "E" Gas Unit G-5-209292 | Bear Grass (Travis Peak) | XTO Energy Inc. | 1 | 0 | 40.1K | Feb 2005 – Oct 2012 |
| Reed -E- G-5-101023 | Bear Grass (Travis Peak) | Marathon Oil Company | 1 | 0 | 41K | Jan 1993 – Dec 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Marathon Oil CompanyJan 1993 → May 1995
- 2XTO Energy Inc.Jun 2004 → Aug 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 548423-99 | Recompletion | XTO Energy Inc. | Jul 19, 2004 | Jul 22, 2004 | Nov 10, 2004 | 15,295 |
| 428226-99 | Recompletion | Marathon Oil Company | Sep 20, 1994 | Sep 20, 1994 | Apr 20, 1994 | 15,297 |
| 169726-99 | Recompletion | TXO Production Corp. | Aug 19, 1982 | Aug 19, 1982 | — | 15,297 |
| 29914-99 | Drill | Texas Oil & Gas Corp. | Aug 4, 1978 | Aug 4, 1978 | Nov 5, 1978 | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-101023 | — | — | — | — |
| — | — G-5-151167 | — | — | — | — |
| — | — G-5-209292 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 473 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 3,924 | -3,451 |
| Woodbine | 5,030 | -4,557 |
| Bma/Rodessa | 8,240 | -7,767 |
| Pettit | 8,720 | -8,247 |
| Travis Peak | 9,120 | -8,647 |
| Cotton ValleyCOTTON VALLEY SAND | 11,250 | -10,777 |
| Cotton ValleyCOTTON VALLEY SD | 11,250 | -10,777 |
| Cotton ValleyCOTTON VALLEY LIME | 13,965 | -13,492 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,895 | 8,906 | Perforated |
| 9,264 | 9,272 | Perforated |
| 9,264 | 9,644 | Perforated |
| 9,572 | 9,644 | Perforated |
| 12,702 | 12,789 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 14 | 82 | 20 | 8 S |
| 9.625 | 1,742 | 12.25 | 750 S |
| 2.875 | 9,489 | — | — |
| 2.875 | 12,514 | — | — |
| 7 | 12,936 | 8.75 | 775 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 6, 2005 | Apr 4, 2005 | — |
| 00 | Jul 12, 2005 | — | — |
| 00 | Oct 12, 1994 | Sep 15, 1994 | Yes |
| 00 | Oct 7, 1994 | — | — |
| 00 | Feb 20, 1985 | Feb 11, 1985 | — |
| 00 | Jan 12, 1984 | Jul 22, 1982 | — |
| 00 | Jan 12, 1984 | Sep 14, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-161-30440 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-161-30440 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16130440, documented in the API reference.