TEXAS · WELLS · FREESTONE COUNTY · API 42-161-30483 · DISTRICT 05
Teague Gas Unit No. 2 #1
Freestone County · Teague (CV-Bossier Cons.) field · Vertical
Teague Gas Unit NO. 2 #1 (API 42-161-30483) is a plugged well in Freestone County, plugged December 4, 2015, last operated by Valence Operating Company.
The RRC has issued 5 drilling permits between 1979 and 2007, permitted to 11,550 ft.
Completion filings report 28 formation tops, including Midway, Wilcox, Nacatoch, Austin Chalk.
Operator of record
- Based in
- Kingwood, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 4, 2026
- Permits on file
- 990
- Phone
- (281) 359-3659
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Valence Operating Company |
| Production reports | Valence Operating Companythrough May 2009 |
| Latest permit | Valence Operating CompanySep 19, 2007 |
- 11,550
- total depth, ft
- 5
- permits on file
- Sep 19, 2007
- last permit issued
- Aug 13, 2007
- completed
- 0
- cumulative oil, bbl
- 120K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 13, 2007
- Shut in
- —
- Plugged
- Dec 4, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Teague Gas Unit No. 2 G-5-231226 | Teague (CV-Bossier Cons.) | Valence Operating Company | 1 | 0 | 1.03K | Aug 2007 – Dec 2015 |
| Teague Gas Unit #2 G-5-147201 | Teague (Travis Peak) | Valence Operating Company | 1 | 0 | 119K | Sep 1993 – Aug 2007 |
| Teague Gas Unit #2 G-5-229851 | Teague, S. (Pettit) | Valence Operating Company | 1 | 0 | 0 | Apr 2006 – Aug 2007 |
| Teague Gas Unit 2 G-5-82635 | Teague, S. (Cotton Valley Lime) | Valence Operating Company | 1 | 0 | 0 | Jan 1993 – Jan 2006 |
| Teague Gas Unit No. 2 G-5-145571 | Teague, West (Cotton Valley) | Valence Operating Company | 1 | 0 | 72 | Jan 1993 – Sep 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Valence Operating CompanyJan 1993 → May 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 646060-99 | Recompletion | Valence Operating Company | Sep 13, 2007 | Sep 19, 2007 | Jul 2, 2007 | 11,550 |
| 617099-99 | Recompletion | Valence Operating Company | Apr 5, 2006 | Apr 6, 2006 | Mar 1, 2006 | 8,400 |
| 416707-99 | Recompletion | Valence Operating Company | Oct 4, 1993 | Oct 18, 1993 | Sep 16, 1993 | 8,380 |
| 407679-99 | Recompletion | Valence Operating Company | Dec 28, 1992 | Dec 28, 1992 | Dec 25, 1992 | 11,140 |
| 42001-99 | Drill | Texas Oil & Gas Corp. | Feb 5, 1979 | Feb 5, 1979 | Feb 22, 1979 | 11,550 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 13, 2007 | Teague Gas Unit No. 2 G-5-231226 | Teague (CV-Bossier Cons.) | Valence Operating Company | Plugged | — |
| Apr 8, 2006 | Teague Gas Unit #2 G-5-229851 | Teague S. (Pettit) | Valence Operating Company | Plugged | — |
| Apr 8, 2006 | Teague Gas Unit #2 G-5-147201 | Teague (Travis Peak) | Valence Operating Company | Plugged | — |
| Jan 21, 1993 | Teague Gas Unit No. 2 G-5-145571 | Teague West (Cotton Valley) | Valence Operating Company | Plugged | — |
| Apr 9, 1979 | Teague Gas Unit 2 G-5-82635 | Teague S. (Cotton Valley Lime) | Valence Operating Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 489 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Midway | 405 | 84 |
| Wilcox | 405 | 84 |
| Nacatoch | 1,575 | -1,086 |
| Austin Chalk | 3,365 | -2,876 |
| Eagle FordEAGLEFORD | 3,697 | -3,208 |
| Woodbine | 4,045 | -3,556 |
| Lower Cret | 4,362 | -3,873 |
| LWR Cret | 4,362 | -3,873 |
| Buda | 4,432 | -3,943 |
| Georgetown | 4,627 | -4,138 |
| Kiamichi | 5,070 | -4,581 |
| Goodland | 5,118 | -4,629 |
| Paluxy | 5,422 | -4,933 |
| Glen RoseUPPER GLEN ROSE | 5,630 | -5,141 |
| Upr Glen Rose | 5,630 | -5,141 |
| Mass Anhydrite | 6,620 | -6,131 |
| Mass. Anhydrite | 6,620 | -6,131 |
| Mass Anydrite | 6,620 | -6,131 |
| Rodessa | 6,737 | -6,248 |
| Bexar | 6,928 | -6,439 |
| James LimeJAMES | 7,127 | -6,638 |
| Pine Island | 7,178 | -6,689 |
| Pettit | 7,238 | -6,749 |
| Pettit | 7,328 | -6,839 |
| Travis Peak | 7,430 | -6,941 |
| TRANSITIONAL0CUS | 9,016 | -8,527 |
| Transitional-CVS | 9,016 | -8,527 |
| Cotton ValleyCOTTON VALLEY SD | 9,330 | -8,841 |
| Cotton Valley | 9,350 | -8,861 |
| Bossier | 10,300 | -9,811 |
| Cotton ValleyCOTTON VALLEY LM | 11,195 | -10,706 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,304 | 7,336 | Perforated |
| 7,304 | 73,336 | Perforated |
| 7,373 | 7,376 | Perforated |
| 7,373 | 7,492 | Perforated |
| 7,538 | 7,680 | Perforated |
| 7,772 | 7,777 | Perforated |
| 7,772 | 7,792 | Perforated |
| 7,788 | 7,792 | Perforated |
| 7,810 | 7,815 | Perforated |
| 10,188 | 10,208 | Perforated |
| 10,248 | 10,274 | Perforated |
| 10,266 | 10,234 | Perforated |
| 11,294 | 11,302 | Perforated |
| 11,335 | 11,346 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 90 | 24 | 8 S |
| 9.625 | 4,547 | 12.25 | 1,275 S |
| 2.875 | 11,175 | — | — |
| 5.5 | 11,549 | 8.75 | 1,350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 27, 2008 | Oct 1, 2007 | — |
| 00 | Dec 6, 2007 | — | — |
| 00 | Oct 15, 2007 | Jul 9, 2007 | — |
| 00 | Oct 8, 2007 | — | — |
| 00 | Dec 10, 1993 | Oct 4, 1993 | Yes |
| 00 | Dec 2, 1993 | — | — |
| 00 | Aug 6, 1993 | May 25, 1993 | Yes |
| 00 | Jun 28, 1993 | — | — |
| 00 | Jan 12, 1984 | Jun 11, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-161-30483 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-161-30483 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16130483, documented in the API reference.