TEXAS · WELLS · FREESTONE COUNTY · API 42-161-30490 · DISTRICT 05
Jackson B #1
Freestone County · Reed (Bossier Sand) field · Vertical
Jackson B #1 (API 42-161-30490) is a plugged well in Freestone County, plugged June 27, 1989, last operated by Smith Pipe Of Abilene.
The RRC has issued 2 drilling permits between 1979 and 1985, permitted to 12,700 ft.
It was permitted by Txo Production Corp. and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.
Completion filings report 7 formation tops, including Massive Anhydrite (marker), Rodessa, James Lime, Pettit.
Operator of record
Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.
- Based in
- Abilene, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Aug 29, 2014
- Phone
- (325) 692-3903
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Smith Pipe of Abilene |
| Production reports | none |
| Latest permit | TXO Production Corp.Apr 15, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,700
- total depth, ft
- 2
- permits on file
- Apr 15, 1985
- last permit issued
- Feb 24, 1988
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 24, 1988
- Shut in
- —
- Plugged
- Jun 27, 1989
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 272359-99 | Recompletion | TXO Production Corp. | Apr 12, 1985 | Apr 15, 1985 | — | 12,700 |
| 45722-99 | Drill | Texas Oil & Gas Corp. | Apr 4, 1979 | Apr 4, 1979 | Apr 20, 1979 | 12,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 24, 1988 | Jackson B G-5-84684 | Reed (Bossier Sand) | Smith Pipe of Abilene | Plugged | — |
| Feb 24, 1988 | Jackson B G-5-84684 | Reed (Bossier Sand) | Smith Pipe of Abilene | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 479 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | 7,312 | -6,833 |
| Rodessa | 7,454 | -6,975 |
| James LimeJAMES | 7,920 | -7,441 |
| Pettit | 8,088 | -7,609 |
| Travis Peak | 8,286 | -7,807 |
| Cotton ValleyCOTTON VALLEY SAND | 10,490 | -10,011 |
| BossierBOSSIER SHALE | 11,428 | -10,949 |
| BossierBOSSIER SAND | 11,626 | -11,147 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,412 | 9,418 | Perforated |
| 11,730 | 11,812 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 80 | 20 | 8 S |
| 9.625 | 4,910 | 12.25 | 1,325 S |
| 2.375 | 12,445 | — | — |
| 4.5 | 12,699 | 7.875 | 1,770 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 16, 1988 | Jul 22, 1988 | Yes |
| 00 | Jan 12, 1984 | Sep 14, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-161-30490 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-161-30490 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16130490, documented in the API reference.