WELL · 42-161-30626 · DISTRICT 5

Willard #1

N

Freestone County · Reed N. (Cotton Valley Lime) field  · Vertical

Willard #1 (API 42-161-30626) is a well in Freestone County operated by Buffco Production Inc., completed November 30, 1980.

The RRC has issued 2 drilling permits between 1980 and 1999, permitted to 13,350 ft.

Completion filings report 10 formation tops, including Del Rio, Glen Rose, Mass Anhydrite, Rodessa.

No lease production has been reported under this well’s leases.

Operator of record

Buffco Production Inc.

Based in
Longview, TX
P-5 status
Active (A)
P-5 last filed
Nov 14, 2025
Permits on file
397
Phone
(903) 988-8199

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBuffco Production Inc.
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitBuffco Production Inc.Mar 24, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,350
total depth, ft
2
permits on file
Mar 24, 1999
last permit issued
Nov 30, 1980
completed
0
cumulative oil, bbl
750K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 30, 1980
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Willard G-5-172497Teague (CV-Bossier Cons.)Hilcorp Energy Company10673KJan 1999 – Jul 2026
Willard G-5-91956Reed, N. (Cotton Valley Lime)Buffco Production Inc.1076.5KJan 1993 – Mar 2000

Gas, mcf lease total

Last 12 months 4,351 · prior 12 4,376(-1%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Petroleum Exchange Oper. Co. IncJan 1993 → Apr 1993
  2. 2Inland Oil and GasMay 1993 → Jul 1994
  3. 3Jess Energy CompanyAug 1994 → Sep 1997
  4. 4Buffco Production Inc.Oct 1997 → Nov 2003
  5. 5XTO Energy Inc.Dec 2003 → Dec 2023
  6. 6Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
483410-99RecompletionBuffco Production Inc.Mar 22, 1999Mar 24, 1999Nov 13, 199812,850
94513-99DrillTexas Oil & Gas Corp.Oct 2, 1980Oct 2, 1980Oct 12, 198013,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-91956————
—— G-5-172497————

Formation tops

As filed on W-2/G-1. Subsea from 456 ft elevation.Download CSV →

FormationMD ftSubsea
Del Rio5,095-4,639
Glen Rose6,385-5,929
Mass Anhydrite7,320-6,864
Rodessa7,515-7,059
James Lime8,070-7,614
Pine Island8,140-7,684
Pettit8,225-7,769
Travis Peak8,415-7,959
Cotton ValleyCOTTON VALLEY SAND10,430-9,974
Bossier11,600-11,144
Cotton ValleyCOTTON VALLEY LIME12,435-11,979

Perforations

Perforated and open-hole intervals.

FromToType
11,87211,886Perforated
11,89111,897Perforated
12,50312,524Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1680208 S
9.6255,00112.252,000 S
2.87512,415——
5.512,8508.752,050 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 5, 1999Mar 19, 1999Yes
00Apr 26, 1999——
00Jan 12, 1984Feb 16, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16130626, documented in the API reference.