TEXAS · WELLS · FREESTONE COUNTY · PARKER "N" LEASE · API 42-161-30909 · DISTRICT 05
Parker N #1
Freestone County · Nan-SU-Gail (Cotton Valley) field · Vertical
Parker N #1 (API 42-161-30909) is a plugged well in Freestone County, plugged April 22, 1993, last operated by Valence Operating Company.
The RRC has issued 2 drilling permits between 1984 and 1993, permitted to 12,850 ft.
Completion filings report 5 formation tops, including Mass Anhyd, Rodessa, Pettit, Travis Peak.
Operator of record
- Based in
- Kingwood, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 4, 2026
- Permits on file
- 990
- Phone
- (281) 359-3659
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Valence Operating Company |
| Production reports | none |
| Latest permit | Valence Operating CompanyApr 13, 1993 |
- 12,850
- total depth, ft
- 2
- permits on file
- Apr 13, 1993
- last permit issued
- Jun 18, 1984
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 18, 1984
- Shut in
- —
- Plugged
- Apr 22, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Parker "N" G-5-112824 | Nan-SU-Gail (Cotton Valley) | Valence Operating Company | 1 | 0 | 0 | Jan 1993 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 410705-99 | Recompletion | Valence Operating Company | Apr 13, 1993 | Apr 13, 1993 | — | 12,300 |
| 233661-99 | Drill | TXO Production Corp. | Mar 26, 1984 | Mar 26, 1984 | — | 12,850 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 18, 1984 | Parker N G-5-112824 | Nan-SU-Gail (Cotton Valley) | Valence Operating Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 365 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Mass Anhyd | 7,100 | -6,735 |
| Rodessa | 7,810 | -7,445 |
| Pettit | 8,421 | -8,056 |
| Travis Peak | 8,610 | -8,245 |
| BossierBOSSIER SHALE | 11,810 | -11,445 |
| BossierBOSSIER SAND | 11,920 | -11,555 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,950 | 12,023 | Perforated |
| 12,154 | 12,160 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 65 | 20 | 8 S |
| 8.625 | 5,200 | 11 | 1,280 S |
| 4.5 | 12,300 | 7.875 | 1,050 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 22, 1984 | Sep 20, 1984 | — |
| 00 | Oct 10, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-161-30909 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-161-30909 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16130909, documented in the API reference.