WELL · 42-161-31214 · DISTRICT 5

Newsom C. A. Estate #5

Shut in

Freestone County · Freestone (Travis Peak) field · Temp Abandoned  · Vertical

Newsom C. A. Estate #5 (API 42-161-31214) is a well in Freestone County operated by Hilcorp Energy Company, completed November 13, 2009 and listed as temp abandoned on the RRC schedule, shut in April 1, 2017.

The RRC has issued 2 drilling permits between 1993 and 2009, permitted to 10,596 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Rodessa, Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsXTO Energy Inc.through Mar 2017
Latest permitXTO Energy Inc.Feb 20, 2009
10,596
total depth, ft
2
permits on file
Feb 20, 2009
last permit issued
Nov 13, 2009
completed
0
cumulative oil, bbl
1.85M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 13, 2009
Shut in
Apr 1, 2017
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Newsom, C. A. Estate G-5-146294Freestone (Travis Peak)Hilcorp Energy Company101.85MAug 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EP Operating Limited PartnershipAug 1993 → Feb 1995
  2. 2Enserch Exploration, IncMar 1995 → Mar 1998
  3. 3Eex CorporationApr 1998 → Apr 1998
  4. 4Cross Timbers Operating CompanyMay 1998 → Apr 2001
  5. 5XTO Energy Inc.Aug 2001 → Mar 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
678367-99RecompletionXTO Energy Inc.Feb 9, 2009Feb 20, 2009—10,596
412663-99DrillEP Operating Limited PartnershipJun 10, 1993Jun 10, 1993Jun 22, 199310,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 13, 2009Newsom C. A. Estate G-5-146294Freestone (Travis Peak)Hilcorp Energy CompanyTemp Abandoned · shut in Apr 1, 201710,596

Formation tops

As filed on W-2/G-1. Subsea from 443 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa7,485-7,042
Pettit8,150-7,707
Travis Peak8,390-7,947

Perforations

Perforated and open-hole intervals.

FromToType
8,3979,959Perforated
9,4339,636Perforated
9,7329,959Perforated
10,16110,447Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,44311385 S
8.6251,44312.25385 S
4.510,5967.8751,281 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 16, 2010Jan 19, 2010—
00Sep 21, 1993Aug 23, 1993Yes
00Sep 3, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16131214, documented in the API reference.