WELL · 42-161-31312 · DISTRICT 5

Newsom C. A. Estate #7

Plugged

Freestone County · Freestone (Travis Peak) field  · Vertical

Newsom C. A. Estate #7 (API 42-161-31312) is a plugged well in Freestone County, plugged October 17, 2014, last operated by Xto Energy Inc..

The RRC has issued 3 drilling permits between 1995 and 2006, permitted to 10,700 ft.

Completion filings report 4 formation tops, including Rodessa, Pettit, Travis Peak, Cotton Valley.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Oct 2014
Latest permitXTO Energy Inc.Jun 20, 2006
10,700
total depth, ft
3
permits on file
Jun 20, 2006
last permit issued
Sep 6, 2006
completed
0
cumulative oil, bbl
412K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1995 THROUGH Oct 2014

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 6, 2006
Shut in
—
Plugged
Oct 17, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Newsom, C.A. Estate G-5-173013Freestone (Pettit)XTO Energy Inc.1019.7KApr 1999 – Oct 2014
Newsom, C. A. Estate G-5-222489Freestone (Travis Peak)XTO Energy Inc.1070.5KSep 2006 – Oct 2014
Newsom, C. A. Estate G-5-155396Freestone (Travis Peak)Cross Timbers Operating Company10322KJun 1995 – Apr 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enserch Exploration, IncJun 1995 → Mar 1998
  2. 2Eex CorporationApr 1998 → Apr 1998
  3. 3Cross Timbers Operating CompanyMay 1998 → May 2001
  4. 4XTO Energy Inc.Jun 2001 → Oct 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
620915-99RecompletionXTO Energy Inc.Jun 13, 2006Jun 20, 2006—10,700
484205-99RecompletionCross Timbers Operating CompanyApr 29, 1999Apr 30, 1999Apr 8, 199910,700
434947-99DrillEnserch Exploration, IncApr 17, 1995Apr 19, 1995May 17, 199510,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-155396————
—— G-5-173013————
—— G-5-222489————

Formation tops

As filed on W-2/G-1. Subsea from 420 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa7,483-7,063
Pettit8,147-7,727
Travis Peak8,385-7,965
Cotton Valley10,453-10,033

Perforations

Perforated and open-hole intervals.

FromToType
8,1538,341Perforated
8,2268,343Perforated
8,3948,567Perforated
8,3949,262Perforated
8,39410,173Perforated
8,7058,897Perforated
8,9849,263Perforated
10,16110,406Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,59511600 S
4.510,6007.8751,100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 23, 2007Oct 6, 2006—
00Mar 21, 2007Oct 6, 2006—
00Dec 1, 2006——
00Jun 18, 1999May 13, 1999Yes
00Jun 10, 1999——
00Mar 30, 1999Dec 15, 1998—
00Oct 6, 1995Jul 14, 1995—
00Oct 2, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16131312, documented in the API reference.