TEXAS · WELLS · FREESTONE COUNTY · NEWSOM, C. A. ESTATE LEASE · API 42-161-31398 · DISTRICT 05

Newsom C. A. Estate #8

Shut in

Freestone County · Freestone (Travis Peak) field · Temp Abandoned  · Vertical

Newsom C. A. Estate #8 (API 42-161-31398) is a well in Freestone County operated by Hilcorp Energy Company, completed June 2, 2004 and listed as temp abandoned on the RRC schedule, shut in April 1, 2021.

The RRC has issued one drilling permit, issued December 11, 1996, permitted to 10,600 ft.

It was permitted by Enserch Exploration, Inc and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including Rodessa, Pettit, Travis Peak, Cotton Valley.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Enserch Exploration, Inc; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsXTO Energy Inc.through Mar 2021
Latest permitEnserch Exploration, IncDec 11, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,600
total depth, ft
1
permits on file
Dec 11, 1996
last permit issued
Jun 2, 2004
completed
0
cumulative oil, bbl
522K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 2, 2004
Shut in
Apr 1, 2021
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Newsom, C. A. Estate G-5-162427Freestone (Travis Peak)Hilcorp Energy Company10522KFeb 1997 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enserch Exploration, IncMar 1997 → Mar 1998
  2. 2Eex CorporationApr 1998 → Apr 1998
  3. 3Cross Timbers Operating CompanyMay 1998 → May 2001
  4. 4XTO Energy Inc.Jun 2001 → Mar 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
456204-99DrillEnserch Exploration, IncDec 11, 1996Dec 11, 1996Dec 31, 199610,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 2, 2004Newsom C. A. Estate G-5-162427Freestone (Travis Peak)Hilcorp Energy CompanyTemp Abandoned · shut in Apr 1, 202110,600

Formation tops

As filed on W-2/G-1. Subsea from 453 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa7,525-7,072
Pettit8,200-7,747
Travis Peak8,440-7,987
Cotton Valley10,478-10,025

Perforations

Perforated and open-hole intervals.

FromToType
8,4448,628Perforated
8,4448,798Perforated
8,7628,798Perforated
9,5049,511Perforated
10,27710,470Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,63011470 S
4.510,6007.8751,635 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 5, 2004Jun 21, 2004—
00Apr 17, 1997Mar 21, 1997Yes
00Apr 14, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16131398, documented in the API reference.