TEXAS · WELLS · FREESTONE COUNTY · API 42-161-31579 · DISTRICT 05

Bonner Tom #1

Y

Freestone County · Loper (Cotton Valley Lime) field · Producing  · Vertical

Bonner Tom #1 (API 42-161-31579) is a well in Freestone County operated by Diversified Production LLC, completed October 11, 2007 and listed as producing on the RRC schedule.

The RRC has issued 3 drilling permits (amended once) between 1999 and 2005, permitted to 12,000 ft.

It was permitted by Apache Corporation and has since transferred to Diversified Production LLC on the wellbore schedule.

Completion filings report 7 formation tops, including Austin Chalk, Woodbine, Rodessa, Pettit.

No lease production has been reported under this well’s leases.

Operator of record

Diversified Production LLC

Permitted by Apache Corporation; the EWA schedule now lists a different operator.

Based in
Keithville, LA
P-5 status
Active – Extension (X)
P-5 last filed
Mar 25, 2026
Permits on file
11
Phone
(318) 751-3917

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDiversified Production LLC
Production reportsDiversified Production LLCthrough Apr 2026
Latest permitApache CorporationAug 12, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
4
permits on file
Aug 12, 2005
last permit issued
Oct 11, 2007
completed
0
cumulative oil, bbl
2.09M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 11, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bonner, Tom G-5-181114Loper (Bossier)Diversified Production LLC101.74MJan 2001 – Jul 2026
Bonner, Tom G-5-216735Loper (Cotton Valley Lime)Diversified Production LLC10273KOct 2005 – Jul 2026
Bonner, Tom G-5-174505Loper (Cotton Valley Lime)Apache Corporation1078.3KAug 1999 – Apr 2001

Gas, mcf lease total

Last 12 months 543 · prior 12 1,561(-65%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Apache CorporationAug 1999 → Nov 2011
  2. 2Patara Oil & Gas LLCDec 2011 → Feb 2012
  3. 3Patara Andover I LLCMar 2012 → Feb 2014
  4. 4Cci Gulf Coast Upstream LLCMar 2014 → Dec 2020
  5. 5TGNR Gulf Coast LLCApr 2021 → Oct 2021
  6. 6Crescent Pass Energy, LLCNov 2021 → Aug 2024
  7. 7Diversified Production LLCOct 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
604890-99RecompletionApache CorporationAug 12, 2005Aug 12, 2005—12,000
502829-99RecompletionApache CorporationDec 8, 2000Dec 8, 2000Jan 2, 200112,000
484212-98DrillApache CorporationAug 5, 1999Apr 29, 1999—12,000
484212-99DrillApache CorporationApr 29, 1999Apr 29, 1999Jun 19, 199912,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 11, 2007Bonner Tom G-5-216735Loper (Cotton Valley Lime)Diversified Production LLCProducing12,000
Jan 16, 2001Bonner Tom G-5-181114Loper (Bossier)Diversified Production LLCSWR-10-Well · shut in Nov 1, 200512,000
Aug 17, 1999Bonner Tom G-5-174505Loper (Cotton Valley Lime)Apache CorporationNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 362 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk3,140-2,778
Woodbine3,896-3,534
Rodessa6,778-6,416
PettitPETTET7,351-6,989
Pettit7,351-6,989
Travis Peak7,510-7,148
Bossier10,443-10,081
Haynesville11,526-11,164

Perforations

Perforated and open-hole intervals.

FromToType
10,62610,630Perforated
10,62610,972Perforated
10,65810,662Perforated
10,77610,780Perforated
10,82810,832Perforated
10,85610,858Perforated
11,45611,561Perforated
11,52611,534Perforated
11,55511,561Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,58012.25595 S
5.512,0007.875770 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 1, 2008Nov 9, 2007—
00Oct 18, 2006Oct 26, 2005Yes
00Jul 5, 2006——
00Apr 18, 2001Feb 15, 2001Yes
00Mar 9, 2001——
00Dec 22, 1999Nov 12, 1999—
00Oct 29, 1999Sep 8, 1999Yes
00Oct 25, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16131579, documented in the API reference.