TEXAS · WELLS · FREESTONE COUNTY · API 42-161-31624 · DISTRICT 05

Thompson C. C. #8

Shut in

Freestone County · Freestone (CV-Bossier Cons.) field · Temp Abandoned  · Vertical

Thompson C. C. #8 (API 42-161-31624) is a well in Freestone County operated by Hilcorp Energy Company, completed March 1, 2006 and listed as temp abandoned on the RRC schedule, shut in April 1, 2020.

The RRC has issued one drilling permit (amended twice), issued August 31, 1999, permitted to 13,080 ft.

It was permitted by Cross Timbers Operating Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including BMA, Pettit, Travis Peak, Cotton Valley.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Cross Timbers Operating Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsXTO Energy Inc.through Mar 2020
Latest permitCross Timbers Operating CompanyAug 31, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,080
total depth, ft
3
permits on file
Aug 31, 1999
last permit issued
Mar 1, 2006
completed
0
cumulative oil, bbl
1.58M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2000 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 1, 2006
Shut in
Apr 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thompson, C. C. G-5-177432Freestone (CV-Bossier Cons.)Hilcorp Energy Company101.58MFeb 2000 – Jul 2026
Thompson, C. C. G-5-176753Oaks (Cotton Valley-Travis Peak)XTO Energy Inc.101.27KJan 2000 – Feb 2006
Thompson, C. C. G-5-177434Freestone (Bossier Sand)XTO Energy Inc.100Feb 2000 – Feb 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cross Timbers Operating CompanyJan 2000 → May 2001
  2. 2XTO Energy Inc.Jun 2001 → Mar 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
487045-97DrillCross Timbers Operating CompanyMar 3, 2000Aug 31, 1999—13,500
487045-98DrillCross Timbers Operating CompanySep 22, 1999Aug 31, 1999Nov 17, 199913,500
487045-99DrillCross Timbers Operating CompanyAug 27, 1999Aug 31, 1999—13,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 1, 2006Thompson C. C. G-5-177432Freestone (CV-Bossier Cons.)Hilcorp Energy CompanyTemp Abandoned · shut in Apr 1, 202013,080
Feb 29, 2000Thompson C. C. G-5-177434Freestone (Bossier Sand)XTO Energy Inc.Not on Schedule—
Jan 22, 2000Thompson C. C. G-5-176753Oaks (Cotton Valley-Travis Peak)XTO Energy Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 458 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,514-7,056
Pettit8,186-7,728
Travis Peak8,426-7,968
Cotton ValleyCOTTON VALLEY SD10,501-10,043
Coton Valley Lime12,752-12,294
Cotton ValleyCOTTON VALLEY LIME12,752-12,294

Perforations

Perforated and open-hole intervals.

FromToType
10,61611,450Perforated
10,61612,823Perforated
11,61812,090Perforated
12,73212,823Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,12412.25365 S
711,5008.751,280 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 19, 2007Oct 27, 2006—
00Sep 13, 2006Apr 19, 2006—
00Jul 31, 2000Jun 13, 2000—
00Jul 31, 2000Apr 27, 2000—
00Jul 6, 2000——
00May 25, 2000Mar 13, 2000Yes
00May 10, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16131624, documented in the API reference.