TEXAS · WELLS · FREESTONE COUNTY · CUMMINS A LEASE · API 42-161-31844 · DISTRICT 05

Cummins A #4

Y

Freestone County · Dew (C.V. Consolidated) field · Producing  · Vertical

Cummins A #4 (API 42-161-31844) is a well in Freestone County operated by Hilcorp Energy Company, completed October 25, 2000 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 11, 2000, permitted to 12,680 ft.

It was permitted by El Paso Production Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Pettit, Travis Peak, Bossier.

Its lease has reported 135 barrels of oil and 4.36M mcf of gas since October 2000, last reporting volume in April 2026.

Operator of record

Hilcorp Energy Company

Permitted by El Paso Production Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitEl Paso Production CompanyAug 11, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,680
total depth, ft
1
permits on file
Aug 11, 2000
last permit issued
Oct 25, 2000
completed
135
cumulative oil, bbl
4.36M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2000 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 25, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cummins A G-5-181127Dew (C.V. Consolidated)Hilcorp Energy Company11354.36MOct 2000 – Apr 2026

Gas, mcf lease total

Last 12 months 9,886 · prior 12 5,904(+67%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1El Paso Production CompanyOct 2000 → Mar 2002
  2. 2Hunt Petroleum CorporationApr 2002 → Nov 2008
  3. 3XTO Energy Inc.Dec 2008 → Dec 2023
  4. 4Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
498391-99DrillEl Paso Production CompanyAug 11, 2000Aug 11, 2000Aug 15, 200013,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 25, 2000Cummins A G-5-181127Dew (C.V. Consolidated)Hilcorp Energy CompanyProducing12,680

Formation tops

As filed on W-2/G-1. Subsea from 421 ft elevation.Download CSV →

FormationMD ftSubsea
Pettit8,470-8,049
Travis Peak8,723-8,302
Bossier12,091-11,670

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,00012.25800 S
711,9988.751,180 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 25, 2001Feb 26, 2001Yes
00Mar 12, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16131844, documented in the API reference.