TEXAS · WELLS · FREESTONE COUNTY · API 42-161-32649 · DISTRICT 05

Hall F. L. #15

Y

Freestone County · Farrar (Travis Peak) field · SWR-10-Well  · Vertical

Hall F. L. #15 (API 42-161-32649) is a well in Freestone County operated by Hilcorp Energy Company, completed November 11, 2004 and listed as swr-10-well on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 2003 and 2005, permitted to 12,516 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including BMA, Pettit, Travis Peak, Cotton Valley.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Aug 23, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,516
total depth, ft
3
permits on file
Aug 23, 2005
last permit issued
Nov 11, 2004
completed
0
cumulative oil, bbl
2.64M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 11, 2004
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hall, F. L. G-5-197094Farrar (Cotton Valley Lime)Hilcorp Energy Company102.64MAug 2003 – Jul 2026
Hall, F. L. G-5-211112Farrar (Travis Peak)Hilcorp Energy Company100Nov 2004 – Jul 2026

Gas, mcf lease total

Last 12 months 77,510 · prior 12 65,431(+18%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Aug 2003 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
543016-98RecompletionXTO Energy Inc.Jan 7, 2005Aug 23, 2005Jul 2, 200312,600
543016-99RecompletionXTO Energy Inc.Mar 9, 2004Apr 9, 2004—12,600
532127-99DrillXTO Energy Inc.May 20, 2003May 23, 2003Jul 2, 200313,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 11, 2004Hall F. L. G-5-211112Farrar (Travis Peak)Hilcorp Energy CompanySWR-10-Well · shut in Nov 1, 200412,516
Nov 11, 2004Hall F. L. G-5-197094Farrar (Cotton Valley Lime)Hilcorp Energy CompanyProducing12,516

Formation tops

As filed on W-2/G-1. Subsea from 462 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,675-7,213
Pettit8,373-7,911
Travis Peak8,622-8,160
Cotton ValleyCOTTON VALLEY SAND10,474-10,012
Bossier11,873-11,411

Perforations

Perforated and open-hole intervals.

FromToType
8,7289,712Perforated
8,7589,712Perforated
11,03912,343Perforated
11,98212,343Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,51012.25755 S
5.512,5168.751,540 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 30, 2005Dec 6, 2004—
00Oct 3, 2005——
00Oct 27, 2003Sep 15, 2003Yes
00Oct 14, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16132649, documented in the API reference.