TEXAS · WELLS · FREESTONE COUNTY · API 42-161-33063 · DISTRICT 05

Henderson-Lott No. 1 Gas Unit #5

Y

Freestone County · Teague (CV-Bossier Cons.) field · Producing  · Vertical

Henderson-Lott NO. 1 Gas Unit #5 (API 42-161-33063) is a well in Freestone County operated by Hilcorp Energy Company, completed November 1, 2007 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 27, 2004, permitted to 12,960 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including BMA, Pettit, Travis Peak, Cotton Valley.

Its 2 leases have reported 3.99K barrels of oil and 2.01M mcf of gas since May 2005, last reporting volume in April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Aug 27, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,960
total depth, ft
1
permits on file
Aug 27, 2004
last permit issued
Nov 1, 2007
completed
3.99K
cumulative oil, bbl
2.01M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2005 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 1, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henderson-Lott No. 1 Gas Unit G-5-211247Teague (CV-Bossier Cons.)Hilcorp Energy Company13.58K1.38MMay 2005 – Apr 2026
Henderson-Lott No. 1 Gas Unit G-5-211245Reed (Haynesville Cons.)XTO Energy Inc.1408628KMay 2005 – Mar 2007

Gas, mcf lease total

Last 12 months 34,743 · prior 12 23,049(+51%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.May 2005 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
550176-99DrillXTO Energy Inc.Aug 26, 2004Aug 27, 2004Mar 9, 200513,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 1, 2007Henderson-Lott No. 1 Gas Unit G-5-211247Teague (CV-Bossier Cons.)Hilcorp Energy CompanyProducing12,960
May 19, 2005Henderson-Lott No. 1 Gas Unit G-5-211245Reed (Haynesville Cons.)XTO Energy Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 442 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,473-7,031
Pettit8,174-7,732
Travis Peak8,381-7,939
Cotton ValleyCOTTON VALLEY SAND10,561-10,119
Bossier11,461-11,019
Cotton ValleyCOTTON VALLEY LIME12,632-12,190

Perforations

Perforated and open-hole intervals.

FromToType
11,48011,910Perforated
11,48012,658Perforated
12,63212,658Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,04712.25350 S
5.512,9608.752,095 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 26, 2007Oct 26, 2007—
00Aug 7, 2007Apr 27, 2007—
00Dec 8, 2005May 31, 2005Yes
00Oct 6, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16133063, documented in the API reference.