TEXAS · WELLS · FREESTONE COUNTY · HENDERSON GAS UNIT LEASE · API 42-161-33595 · DISTRICT 05

Henderson Gas Unit #19

Y

Freestone County · Teague (CV-Bossier Cons.) field · Producing  · Vertical

Henderson Gas Unit #19 (API 42-161-33595) is a well in Freestone County operated by Hilcorp Energy Company, completed February 23, 2007 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued July 5, 2006, permitted to 12,667 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 6 formation tops, including BMA, Pettit, Travis Peak, Knowles.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Jul 5, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,667
total depth, ft
2
permits on file
Jul 5, 2006
last permit issued
Feb 23, 2007
completed
0
cumulative oil, bbl
1.38M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 23, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henderson Gas Unit G-5-228160Teague (CV-Bossier Cons.)Hilcorp Energy Company101.38MFeb 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 12,945 · prior 12 14,034(-8%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Feb 2007 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
619541-98DrillXTO Energy Inc.Aug 10, 2006Jul 5, 2006Dec 19, 200613,000
619541-99DrillXTO Energy Inc.May 18, 2006Jul 5, 2006—13,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 23, 2007Henderson Gas Unit G-5-228160Teague (CV-Bossier Cons.)Hilcorp Energy CompanyProducing12,667

Formation tops

As filed on W-2/G-1. Subsea from 490 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,471-6,981
Pettit8,147-7,657
Travis Peak8,368-7,878
Knowles10,499-10,009
Bossier11,337-10,847
Cotton ValleyCOTTON VALLEY LIME12,331-11,841

Perforations

Perforated and open-hole intervals.

FromToType
11,34812,510Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,11312.25375 S
711,3718.751,654 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 6, 2007May 21, 2007Yes
00Jul 18, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16133595, documented in the API reference.